Files
red/.planning/phases/05-pdf-fill-and-field-mapping/05-04-SUMMARY.md
Chandler Copeland 5bd77c1368 docs(05-04): complete pdf-fill-and-field-mapping plan 04 checkpoint
- Created 05-04-SUMMARY.md documenting Phase 5 human verification checkpoint
- Updated STATE.md: checkpoint:human-verify reached, awaiting sign-off on 10-step browser verification
- All Phase 5 implementation (DOC-04, DOC-05, DOC-06) complete in plans 05-01 through 05-03

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-20 00:09:26 -06:00

101 lines
3.1 KiB
Markdown

---
phase: 05-pdf-fill-and-field-mapping
plan: "04"
subsystem: ui
tags: [human-verify, checkpoint, pdf, signature-fields, document-preparation]
# Dependency graph
requires:
- phase: 05-02-pdf-fill-and-field-mapping
provides: Drag-and-drop FieldPlacer component on PDF pages with DB persistence
- phase: 05-03-pdf-fill-and-field-mapping
provides: TextFillForm and PreparePanel components wired to /api/documents/[id]/prepare
- phase: 05-01-pdf-fill-and-field-mapping
provides: POST /api/documents/[id]/prepare endpoint that writes prepared PDF and transitions status to Sent
provides:
- Human sign-off on Phase 5 end-to-end workflow (DOC-04, DOC-05, DOC-06)
affects:
- 06-signing-flow
# Tech tracking
tech-stack:
added: []
patterns:
- "Human verification checkpoint: 10-step manual browser walkthrough covering all three requirements"
key-files:
created: []
modified: []
key-decisions:
- "Phase 5 human verification: tester must confirm drag-and-drop placement, text fill form, client assignment, Prepare and Send, status transitions, and prepared PDF file creation on disk"
patterns-established: []
requirements-completed: [DOC-04, DOC-05, DOC-06]
# Metrics
duration: 0min
completed: "2026-03-20"
---
# Phase 5 Plan 04: Human Verification Checkpoint Summary
**Phase 5 PDF fill and field mapping end-to-end browser verification — awaiting human tester sign-off on all 10 steps covering DOC-04, DOC-05, and DOC-06**
## Performance
- **Duration:** 0 min (checkpoint plan — no auto tasks)
- **Started:** 2026-03-20T06:08:20Z
- **Completed:** Pending human verification
- **Tasks:** 0 auto / 1 checkpoint
- **Files modified:** 0
## Accomplishments
- Checkpoint reached after all Phase 5 implementation plans (05-01 through 05-03) completed
- All three requirements (DOC-04, DOC-05, DOC-06) implemented in prior plans — awaiting human confirmation
- Verification script prepared: 10-step browser walkthrough with expected outcomes for each step
## Task Commits
No auto tasks in this plan — this is a pure human-verification checkpoint.
## Files Created/Modified
None — this plan contains only a human-verification checkpoint task.
## Decisions Made
None - this plan is a blocking checkpoint requiring human verification before Phase 6 begins.
## Deviations from Plan
None - plan executed exactly as written. No auto tasks were present.
## Issues Encountered
None — awaiting human verification.
## User Setup Required
None — application should already be running from prior development. If not:
```bash
cd teressa-copeland-homes && npm run dev
```
## Next Phase Readiness
- **Blocked on:** Human tester completing all 10 verification steps and providing sign-off ("approved" signal)
- Phase 6 (Signing Flow) can begin after this checkpoint passes
- Key Phase 6 blocker: DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before signing links reach real clients
---
*Phase: 05-pdf-fill-and-field-mapping*
*Completed: 2026-03-20 (pending human sign-off)*
## Self-Check: PASSED
- No auto tasks to verify — checkpoint plan only
- SUMMARY.md created at expected path