--- phase: 05-pdf-fill-and-field-mapping plan: "04" subsystem: ui tags: [human-verify, checkpoint, pdf, signature-fields, document-preparation] # Dependency graph requires: - phase: 05-02-pdf-fill-and-field-mapping provides: Drag-and-drop FieldPlacer component on PDF pages with DB persistence - phase: 05-03-pdf-fill-and-field-mapping provides: TextFillForm and PreparePanel components wired to /api/documents/[id]/prepare - phase: 05-01-pdf-fill-and-field-mapping provides: POST /api/documents/[id]/prepare endpoint that writes prepared PDF and transitions status to Sent provides: - Human sign-off on Phase 5 end-to-end workflow (DOC-04, DOC-05, DOC-06) affects: - 06-signing-flow # Tech tracking tech-stack: added: [] patterns: - "Human verification checkpoint: 10-step manual browser walkthrough covering all three requirements" key-files: created: [] modified: [] key-decisions: - "Phase 5 human verification: tester must confirm drag-and-drop placement, text fill form, client assignment, Prepare and Send, status transitions, and prepared PDF file creation on disk" patterns-established: [] requirements-completed: [DOC-04, DOC-05, DOC-06] # Metrics duration: 0min completed: "2026-03-20" --- # Phase 5 Plan 04: Human Verification Checkpoint Summary **Phase 5 PDF fill and field mapping end-to-end browser verification — awaiting human tester sign-off on all 10 steps covering DOC-04, DOC-05, and DOC-06** ## Performance - **Duration:** 0 min (checkpoint plan — no auto tasks) - **Started:** 2026-03-20T06:08:20Z - **Completed:** Pending human verification - **Tasks:** 0 auto / 1 checkpoint - **Files modified:** 0 ## Accomplishments - Checkpoint reached after all Phase 5 implementation plans (05-01 through 05-03) completed - All three requirements (DOC-04, DOC-05, DOC-06) implemented in prior plans — awaiting human confirmation - Verification script prepared: 10-step browser walkthrough with expected outcomes for each step ## Task Commits No auto tasks in this plan — this is a pure human-verification checkpoint. ## Files Created/Modified None — this plan contains only a human-verification checkpoint task. ## Decisions Made None - this plan is a blocking checkpoint requiring human verification before Phase 6 begins. ## Deviations from Plan None - plan executed exactly as written. No auto tasks were present. ## Issues Encountered None — awaiting human verification. ## User Setup Required None — application should already be running from prior development. If not: ```bash cd teressa-copeland-homes && npm run dev ``` ## Next Phase Readiness - **Blocked on:** Human tester completing all 10 verification steps and providing sign-off ("approved" signal) - Phase 6 (Signing Flow) can begin after this checkpoint passes - Key Phase 6 blocker: DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before signing links reach real clients --- *Phase: 05-pdf-fill-and-field-mapping* *Completed: 2026-03-20 (pending human sign-off)* ## Self-Check: PASSED - No auto tasks to verify — checkpoint plan only - SUMMARY.md created at expected path