101 lines
3.1 KiB
Markdown
101 lines
3.1 KiB
Markdown
|
|
---
|
||
|
|
phase: 05-pdf-fill-and-field-mapping
|
||
|
|
plan: "04"
|
||
|
|
subsystem: ui
|
||
|
|
tags: [human-verify, checkpoint, pdf, signature-fields, document-preparation]
|
||
|
|
|
||
|
|
# Dependency graph
|
||
|
|
requires:
|
||
|
|
- phase: 05-02-pdf-fill-and-field-mapping
|
||
|
|
provides: Drag-and-drop FieldPlacer component on PDF pages with DB persistence
|
||
|
|
- phase: 05-03-pdf-fill-and-field-mapping
|
||
|
|
provides: TextFillForm and PreparePanel components wired to /api/documents/[id]/prepare
|
||
|
|
- phase: 05-01-pdf-fill-and-field-mapping
|
||
|
|
provides: POST /api/documents/[id]/prepare endpoint that writes prepared PDF and transitions status to Sent
|
||
|
|
provides:
|
||
|
|
- Human sign-off on Phase 5 end-to-end workflow (DOC-04, DOC-05, DOC-06)
|
||
|
|
affects:
|
||
|
|
- 06-signing-flow
|
||
|
|
|
||
|
|
# Tech tracking
|
||
|
|
tech-stack:
|
||
|
|
added: []
|
||
|
|
patterns:
|
||
|
|
- "Human verification checkpoint: 10-step manual browser walkthrough covering all three requirements"
|
||
|
|
|
||
|
|
key-files:
|
||
|
|
created: []
|
||
|
|
modified: []
|
||
|
|
|
||
|
|
key-decisions:
|
||
|
|
- "Phase 5 human verification: tester must confirm drag-and-drop placement, text fill form, client assignment, Prepare and Send, status transitions, and prepared PDF file creation on disk"
|
||
|
|
|
||
|
|
patterns-established: []
|
||
|
|
|
||
|
|
requirements-completed: [DOC-04, DOC-05, DOC-06]
|
||
|
|
|
||
|
|
# Metrics
|
||
|
|
duration: 0min
|
||
|
|
completed: "2026-03-20"
|
||
|
|
---
|
||
|
|
|
||
|
|
# Phase 5 Plan 04: Human Verification Checkpoint Summary
|
||
|
|
|
||
|
|
**Phase 5 PDF fill and field mapping end-to-end browser verification — awaiting human tester sign-off on all 10 steps covering DOC-04, DOC-05, and DOC-06**
|
||
|
|
|
||
|
|
## Performance
|
||
|
|
|
||
|
|
- **Duration:** 0 min (checkpoint plan — no auto tasks)
|
||
|
|
- **Started:** 2026-03-20T06:08:20Z
|
||
|
|
- **Completed:** Pending human verification
|
||
|
|
- **Tasks:** 0 auto / 1 checkpoint
|
||
|
|
- **Files modified:** 0
|
||
|
|
|
||
|
|
## Accomplishments
|
||
|
|
|
||
|
|
- Checkpoint reached after all Phase 5 implementation plans (05-01 through 05-03) completed
|
||
|
|
- All three requirements (DOC-04, DOC-05, DOC-06) implemented in prior plans — awaiting human confirmation
|
||
|
|
- Verification script prepared: 10-step browser walkthrough with expected outcomes for each step
|
||
|
|
|
||
|
|
## Task Commits
|
||
|
|
|
||
|
|
No auto tasks in this plan — this is a pure human-verification checkpoint.
|
||
|
|
|
||
|
|
## Files Created/Modified
|
||
|
|
|
||
|
|
None — this plan contains only a human-verification checkpoint task.
|
||
|
|
|
||
|
|
## Decisions Made
|
||
|
|
|
||
|
|
None - this plan is a blocking checkpoint requiring human verification before Phase 6 begins.
|
||
|
|
|
||
|
|
## Deviations from Plan
|
||
|
|
|
||
|
|
None - plan executed exactly as written. No auto tasks were present.
|
||
|
|
|
||
|
|
## Issues Encountered
|
||
|
|
|
||
|
|
None — awaiting human verification.
|
||
|
|
|
||
|
|
## User Setup Required
|
||
|
|
|
||
|
|
None — application should already be running from prior development. If not:
|
||
|
|
```bash
|
||
|
|
cd teressa-copeland-homes && npm run dev
|
||
|
|
```
|
||
|
|
|
||
|
|
## Next Phase Readiness
|
||
|
|
|
||
|
|
- **Blocked on:** Human tester completing all 10 verification steps and providing sign-off ("approved" signal)
|
||
|
|
- Phase 6 (Signing Flow) can begin after this checkpoint passes
|
||
|
|
- Key Phase 6 blocker: DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before signing links reach real clients
|
||
|
|
|
||
|
|
---
|
||
|
|
*Phase: 05-pdf-fill-and-field-mapping*
|
||
|
|
*Completed: 2026-03-20 (pending human sign-off)*
|
||
|
|
|
||
|
|
## Self-Check: PASSED
|
||
|
|
|
||
|
|
- No auto tasks to verify — checkpoint plan only
|
||
|
|
- SUMMARY.md created at expected path
|