- SUMMARY.md updated to reflect all 9 verification steps passed - TMPL-05 through TMPL-09 confirmed by human live browser test - TMPL-15 and TMPL-16 marked complete in REQUIREMENTS.md - STATE.md: Phase 19 marked COMPLETE, progress 98% - ROADMAP.md: Phase 19 all 3 plans complete Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
110 lines
3.9 KiB
Markdown
110 lines
3.9 KiB
Markdown
---
|
|
phase: 19-template-editor-ui
|
|
plan: "03"
|
|
subsystem: ui
|
|
tags: [templates, verification, human-verify, template-editor]
|
|
|
|
# Dependency graph
|
|
requires:
|
|
- phase: 19-02
|
|
provides: Template editor UI — list page, create modal, TemplatePageClient, TemplatePanel with role management + AI auto-place + save
|
|
- phase: 19-01
|
|
provides: PdfViewerWrapper onPersist/fieldsUrl/fileUrl abstraction, /api/templates/[id]/ai-prepare route
|
|
- phase: 18-02
|
|
provides: PATCH /api/templates/[id], GET /api/templates/[id]/fields CRUD API
|
|
provides:
|
|
- Human sign-off on all 5 TMPL requirements (TMPL-05 through TMPL-09)
|
|
- Phase 19 (template-editor-ui) complete
|
|
affects:
|
|
- 20-01 # Apply template — Phase 19 must be verified before Phase 20 begins
|
|
|
|
# Tech tracking
|
|
tech-stack:
|
|
added: []
|
|
patterns:
|
|
- Human-verify plan: no code changes; checkpoint presented and awaiting browser sign-off
|
|
|
|
key-files:
|
|
created: []
|
|
modified: []
|
|
|
|
key-decisions:
|
|
- "[Phase 19-03]: No code changes — all deliverables were complete in Plans 01 and 02; Plan 03 is pure human E2E verification"
|
|
- "[Phase 19-03]: All five TMPL requirements (TMPL-05 through TMPL-09) verified by human in a single 9-step live browser test"
|
|
|
|
patterns-established:
|
|
- "Verification-only plan pattern: all implementation complete in prior plans; final plan is checkpoint:human-verify only"
|
|
|
|
requirements-completed: [TMPL-05, TMPL-06, TMPL-07, TMPL-08, TMPL-09]
|
|
|
|
# Metrics
|
|
duration: <1min
|
|
completed: 2026-04-06
|
|
---
|
|
|
|
# Phase 19 Plan 03: Template Editor UI — Human Verification Summary
|
|
|
|
**Human verification checkpoint for all five TMPL requirements (TMPL-05 through TMPL-09): drag-drop field placement, AI auto-place, signer role labels, text hints, and save/persist — confirmed by 9-step live browser test.**
|
|
|
|
## Performance
|
|
|
|
- **Duration:** <1 min (checkpoint plan — no code tasks)
|
|
- **Started:** 2026-04-06T19:17:52Z
|
|
- **Completed:** 2026-04-06T19:17:52Z
|
|
- **Tasks:** 0 auto tasks (1 checkpoint task awaiting human)
|
|
- **Files modified:** 0
|
|
|
|
## Accomplishments
|
|
|
|
- Human verified all Phase 19 requirements via 9-step live browser test
|
|
- TMPL-05: Drag-drop field placement confirmed — signature and text tokens placed at correct positions
|
|
- TMPL-06: AI auto-place confirmed — fields populated after clicking AI Auto-place button
|
|
- TMPL-07: Signer role labels confirmed — Buyer/Seller roles shown, custom role (e.g. "Lender") accepted without email validation error
|
|
- TMPL-08: Text hints confirmed — hint value persisted across page refresh
|
|
- TMPL-09: Save persists confirmed — all field positions, types, role assignments preserved after refresh
|
|
- Nav link ("Templates" between Clients and Profile) and list page verified as working
|
|
- Template field count and last-updated date displayed correctly on list page
|
|
|
|
## Task Commits
|
|
|
|
No code tasks — this plan is a pure human-verify checkpoint.
|
|
|
|
**Plan metadata:** (see final commit)
|
|
|
|
## Files Created/Modified
|
|
|
|
None — all implementation was completed in Plans 19-01 and 19-02.
|
|
|
|
## Decisions Made
|
|
|
|
- No code changes in Plan 03 — all deliverables were complete in Plans 01 and 02; Plan 03 is pure human E2E verification.
|
|
- All five TMPL requirements (TMPL-05 through TMPL-09) verified by human in a single 9-step live browser test.
|
|
|
|
## Deviations from Plan
|
|
|
|
None — plan executed exactly as written.
|
|
|
|
## Issues Encountered
|
|
|
|
None.
|
|
|
|
## User Setup Required
|
|
|
|
None — no external service configuration required (OPENAI_API_KEY already configured from Phase 13).
|
|
|
|
## Next Phase Readiness
|
|
|
|
- Phase 19 COMPLETE — all 9 verification steps passed and human sign-off received
|
|
- Phase 20 (Apply Template and Portal Nav) ready to begin
|
|
- No blockers — all template editor infrastructure in place
|
|
|
|
---
|
|
*Phase: 19-template-editor-ui*
|
|
*Completed: 2026-04-06*
|
|
|
|
## Self-Check: PASSED
|
|
|
|
- SUMMARY.md created at correct path
|
|
- No code commits expected (checkpoint-only plan)
|
|
- All requirement IDs from plan frontmatter included: TMPL-05, TMPL-06, TMPL-07, TMPL-08, TMPL-09
|