- Created 05-04-SUMMARY.md documenting Phase 5 human verification checkpoint - Updated STATE.md: checkpoint:human-verify reached, awaiting sign-off on 10-step browser verification - All Phase 5 implementation (DOC-04, DOC-05, DOC-06) complete in plans 05-01 through 05-03 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
3.1 KiB
3.1 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 05-pdf-fill-and-field-mapping | 04 | ui |
|
|
|
|
|
|
|
|
0min | 2026-03-20 |
Phase 5 Plan 04: Human Verification Checkpoint Summary
Phase 5 PDF fill and field mapping end-to-end browser verification — awaiting human tester sign-off on all 10 steps covering DOC-04, DOC-05, and DOC-06
Performance
- Duration: 0 min (checkpoint plan — no auto tasks)
- Started: 2026-03-20T06:08:20Z
- Completed: Pending human verification
- Tasks: 0 auto / 1 checkpoint
- Files modified: 0
Accomplishments
- Checkpoint reached after all Phase 5 implementation plans (05-01 through 05-03) completed
- All three requirements (DOC-04, DOC-05, DOC-06) implemented in prior plans — awaiting human confirmation
- Verification script prepared: 10-step browser walkthrough with expected outcomes for each step
Task Commits
No auto tasks in this plan — this is a pure human-verification checkpoint.
Files Created/Modified
None — this plan contains only a human-verification checkpoint task.
Decisions Made
None - this plan is a blocking checkpoint requiring human verification before Phase 6 begins.
Deviations from Plan
None - plan executed exactly as written. No auto tasks were present.
Issues Encountered
None — awaiting human verification.
User Setup Required
None — application should already be running from prior development. If not:
cd teressa-copeland-homes && npm run dev
Next Phase Readiness
- Blocked on: Human tester completing all 10 verification steps and providing sign-off ("approved" signal)
- Phase 6 (Signing Flow) can begin after this checkpoint passes
- Key Phase 6 blocker: DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before signing links reach real clients
Phase: 05-pdf-fill-and-field-mapping Completed: 2026-03-20 (pending human sign-off)
Self-Check: PASSED
- No auto tasks to verify — checkpoint plan only
- SUMMARY.md created at expected path