Files
red/.planning/STATE.md
Chandler Copeland 9500f812e0 docs(02-03): complete human verification — phase 2 approved
- All 7 checklist items approved by human reviewer
- Visual fixes applied: hero objectPosition 20%, contact form white inputs, testimonial gold accent bar
- Phase 2 marketing site marked complete (MKTG-01 through MKTG-04 satisfied)
- STATE.md updated: phase 2 complete, 6/6 plans done, progress 40%
2026-03-19 15:19:22 -06:00

4.3 KiB

gsd_state_version, milestone, milestone_name, status, last_updated, progress
gsd_state_version milestone milestone_name status last_updated progress
1.0 v1.0 milestone unknown 2026-03-19T21:03:39.146Z
total_phases completed_phases total_plans completed_plans
2 2 6 6

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-19)

Core value: Teressa can prepare and send any real estate form to a client for signing in minutes, from her browser, without leaving her site. Current focus: Phase 2 - Marketing Site

Current Position

Phase: 2 of 7 (Marketing Site) — COMPLETE Plan: 02-03 complete (all 3 plans in phase complete) Status: Phase 2 complete — awaiting Phase 3 start Last activity: 2026-03-19 — Plan 02-03 complete: Human verification approved all 7 checklist items; Phase 2 marketing site complete

Progress: [████░░░░░░] 40%

Performance Metrics

Velocity:

  • Total plans completed: 2
  • Average duration: 4 min
  • Total execution time: 0.1 hours

By Phase:

Phase Plans Total Avg/Plan
01-foundation 2/3 8 min 4 min
02-marketing-site 2/3 8 min 4 min

Recent Trend:

  • Last 5 plans: 01-01 (6 min), 01-02 (2 min), 02-01 (4 min), 02-02 (4 min)
  • Trend: stable

Updated after each plan completion | Phase 02-marketing-site P01 | 5 | 2 tasks | 8 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Custom e-signature over DocuSign: lower ongoing cost for solo agent; full brand control
  • Next.js full-stack: single repo for marketing + web app via API routes
  • Email-link signing (no client account): lowest friction for clients; standard in real estate
  • utahrealestate.com forms scraping: AVOID — violates ToS; use manual PDF upload instead
  • Infrastructure: local PostgreSQL (Docker) + local npm run dev; no Vercel, no Neon, no cloud storage — home Docker server is eventual target
  • [Phase 01-foundation]: Lazy Proxy singleton for db/index.ts prevents neon() crash during Next.js build when DATABASE_URL absent
  • [Phase 01-foundation]: next-auth pinned to exact version 5.0.0-beta.30; middleware.ts at project root not src/; force-dynamic on auth route
  • [Phase 01-foundation 01-02]: PasswordField extracted as co-located client sub-component — keeps login page.tsx as pure server component
  • [Phase 01-foundation 01-02]: loginAction re-throws non-AuthError (NEXT_REDIRECT must bubble) — critical Auth.js v5 server action pattern
  • [Phase 01-foundation 01-02]: Brand colors applied via inline style props — Tailwind JIT may miss one-off hex values
  • [Phase 02-marketing-site]: CSS hover classes in server components — onMouseEnter/onMouseLeave not valid in server component props; use className with style blocks instead
  • [Phase 02-marketing-site]: lucide-react installed for marketing site icons (Home, Menu, X, ChevronLeft, ChevronRight)
  • [Phase 02-marketing-site 02-02]: nodemailer pinned to ^7.0.7 — v8 conflicts with next-auth@5.0.0-beta.30 peerOptional dep
  • [Phase 02-marketing-site 02-02]: useActionState imported from 'react' not 'react-dom' — React 19 canonical API (useFormState removed in React 19)
  • [Phase 02-marketing-site 02-02]: Honeypot silent success pattern — bots receive status:success without email sent, preventing bot discovery of rejection

Pending Todos

None yet.

Blockers/Concerns

  • WFRMLS vendor enrollment takes 2-4 weeks — start process immediately, build Phase 2 listings with mock data while waiting
  • Phase 6 (Signing Flow) warrants a /gsd:research-phase before planning — JWT one-time enforcement + ESIGN/UETA audit + mobile touch has edge cases
  • DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before any signing link reaches a real client (Phase 6 acceptance criterion)
  • Exact WFRMLS required IDX disclaimer text must be obtained directly from WFRMLS before listings feature ships (Phase 2)
  • WFRMLS vendor enrollment takes 2-4 weeks — start process immediately, build Phase 2 listings with mock data while waiting (moved from Blockers)

Session Continuity

Last session: 2026-03-19 Stopped at: Completed 02-03-PLAN.md — Human verification approved; Phase 2 marketing site complete with visual fixes (hero objectPosition, contact field styling, testimonial accent bar) Resume file: None