4.3 KiB
gsd_state_version, milestone, milestone_name, status, last_updated, progress
| gsd_state_version | milestone | milestone_name | status | last_updated | progress | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | unknown | 2026-03-19T21:27:39.353Z |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-03-19)
Core value: Teressa can prepare and send any real estate form to a client for signing in minutes, from her browser, without leaving her site. Current focus: Phase 2 - Marketing Site
Current Position
Phase: 2 of 7 (Marketing Site) — COMPLETE Plan: 02-03 complete (all 3 plans in phase complete) Status: Phase 2 complete — awaiting Phase 3 start Last activity: 2026-03-19 — Plan 02-03 complete: Human verification approved all 7 checklist items; Phase 2 marketing site complete
Progress: [████░░░░░░] 40%
Performance Metrics
Velocity:
- Total plans completed: 2
- Average duration: 4 min
- Total execution time: 0.1 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-foundation | 2/3 | 8 min | 4 min |
| 02-marketing-site | 2/3 | 8 min | 4 min |
Recent Trend:
- Last 5 plans: 01-01 (6 min), 01-02 (2 min), 02-01 (4 min), 02-02 (4 min)
- Trend: stable
Updated after each plan completion | Phase 02-marketing-site P01 | 5 | 2 tasks | 8 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Custom e-signature over DocuSign: lower ongoing cost for solo agent; full brand control
- Next.js full-stack: single repo for marketing + web app via API routes
- Email-link signing (no client account): lowest friction for clients; standard in real estate
- utahrealestate.com forms scraping: AVOID — violates ToS; use manual PDF upload instead
- Infrastructure: local PostgreSQL (Docker) + local
npm run dev; no Vercel, no Neon, no cloud storage — home Docker server is eventual target - [Phase 01-foundation]: Lazy Proxy singleton for db/index.ts prevents neon() crash during Next.js build when DATABASE_URL absent
- [Phase 01-foundation]: next-auth pinned to exact version 5.0.0-beta.30; middleware.ts at project root not src/; force-dynamic on auth route
- [Phase 01-foundation 01-02]: PasswordField extracted as co-located client sub-component — keeps login page.tsx as pure server component
- [Phase 01-foundation 01-02]: loginAction re-throws non-AuthError (NEXT_REDIRECT must bubble) — critical Auth.js v5 server action pattern
- [Phase 01-foundation 01-02]: Brand colors applied via inline style props — Tailwind JIT may miss one-off hex values
- [Phase 02-marketing-site]: CSS hover classes in server components — onMouseEnter/onMouseLeave not valid in server component props; use className with style blocks instead
- [Phase 02-marketing-site]: lucide-react installed for marketing site icons (Home, Menu, X, ChevronLeft, ChevronRight)
- [Phase 02-marketing-site 02-02]: nodemailer pinned to ^7.0.7 — v8 conflicts with next-auth@5.0.0-beta.30 peerOptional dep
- [Phase 02-marketing-site 02-02]: useActionState imported from 'react' not 'react-dom' — React 19 canonical API (useFormState removed in React 19)
- [Phase 02-marketing-site 02-02]: Honeypot silent success pattern — bots receive status:success without email sent, preventing bot discovery of rejection
Pending Todos
None yet.
Blockers/Concerns
- WFRMLS vendor enrollment takes 2-4 weeks — start process immediately, build Phase 2 listings with mock data while waiting
- Phase 6 (Signing Flow) warrants a /gsd:research-phase before planning — JWT one-time enforcement + ESIGN/UETA audit + mobile touch has edge cases
- DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before any signing link reaches a real client (Phase 6 acceptance criterion)
- Exact WFRMLS required IDX disclaimer text must be obtained directly from WFRMLS before listings feature ships (Phase 2)
- WFRMLS vendor enrollment takes 2-4 weeks — start process immediately, build Phase 2 listings with mock data while waiting (moved from Blockers)
Session Continuity
Last session: 2026-03-19 Stopped at: Completed 02-03-PLAN.md — Human verification approved; Phase 2 marketing site complete with visual fixes (hero objectPosition, contact field styling, testimonial accent bar) Resume file: None