--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: unknown last_updated: "2026-03-19T22:53:59.607Z" progress: total_phases: 3 completed_phases: 3 total_plans: 10 completed_plans: 10 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-03-19) **Core value:** Teressa can prepare and send any real estate form to a client for signing in minutes, from her browser, without leaving her site. **Current focus:** Phase 3 - Agent Portal Shell ## Current Position Phase: 3 of 7 (Agent Portal Shell) — Complete Plan: 03-04 complete (4 of 4 plans in phase complete) Status: Phase 3 complete — full portal shell verified end-to-end: auth redirect, dashboard documents table with filter, clients card grid with create/edit/delete, client profile page with edit/delete and documents table, top nav Last activity: 2026-03-19 — Plan 03-04 complete: Client profile page (edit modal + delete confirmation + documents table) + full Phase 3 portal browser verification approved Progress: [██████░░░░] 60% ## Performance Metrics **Velocity:** - Total plans completed: 2 - Average duration: 4 min - Total execution time: 0.1 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 01-foundation | 2/3 | 8 min | 4 min | | 02-marketing-site | 2/3 | 8 min | 4 min | **Recent Trend:** - Last 5 plans: 01-01 (6 min), 01-02 (2 min), 02-01 (4 min), 02-02 (4 min) - Trend: stable *Updated after each plan completion* | Phase 02-marketing-site P01 | 5 | 2 tasks | 8 files | | Phase 03-agent-portal-shell P01 | 3 | 2 tasks | 6 files | | Phase 03-agent-portal-shell P02 | 8 | 3 tasks | 5 files | | Phase 03-agent-portal-shell P03 | 9 | 3 tasks | 7 files | | Phase 03-agent-portal-shell P04 | 5 | 2 tasks | 3 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - Custom e-signature over DocuSign: lower ongoing cost for solo agent; full brand control - Next.js full-stack: single repo for marketing + web app via API routes - Email-link signing (no client account): lowest friction for clients; standard in real estate - utahrealestate.com forms scraping: AVOID — violates ToS; use manual PDF upload instead - Infrastructure: local PostgreSQL (Docker) + local `npm run dev`; no Vercel, no Neon, no cloud storage — home Docker server is eventual target - [Phase 01-foundation]: Lazy Proxy singleton for db/index.ts prevents neon() crash during Next.js build when DATABASE_URL absent - [Phase 01-foundation]: next-auth pinned to exact version 5.0.0-beta.30; middleware.ts at project root not src/; force-dynamic on auth route - [Phase 01-foundation 01-02]: PasswordField extracted as co-located client sub-component — keeps login page.tsx as pure server component - [Phase 01-foundation 01-02]: loginAction re-throws non-AuthError (NEXT_REDIRECT must bubble) — critical Auth.js v5 server action pattern - [Phase 01-foundation 01-02]: Brand colors applied via inline style props — Tailwind JIT may miss one-off hex values - [Phase 02-marketing-site]: CSS hover classes in server components — onMouseEnter/onMouseLeave not valid in server component props; use className with style blocks instead - [Phase 02-marketing-site]: lucide-react installed for marketing site icons (Home, Menu, X, ChevronLeft, ChevronRight) - [Phase 02-marketing-site 02-02]: nodemailer pinned to ^7.0.7 — v8 conflicts with next-auth@5.0.0-beta.30 peerOptional dep - [Phase 02-marketing-site 02-02]: useActionState imported from 'react' not 'react-dom' — React 19 canonical API (useFormState removed in React 19) - [Phase 02-marketing-site 02-02]: Honeypot silent success pattern — bots receive status:success without email sent, preventing bot discovery of rejection - [Phase 03-agent-portal-shell]: documentStatusEnum exported before documents table in schema.ts — pgEnum must precede referencing table or drizzle-kit may omit CREATE TYPE from migration - [Phase 03-agent-portal-shell]: Portal route protection: add new prefix to both middleware.ts matcher array AND auth.config.ts authorized callback isPortalRoute check — mirrors existing /agent pattern - [Phase 03-agent-portal-shell]: Post-login redirect changed from /agent/dashboard to /portal/dashboard — agent portal lives at /portal prefix going forward - [Phase 03-agent-portal-shell]: Zod v4 uses .issues not .errors for ZodError — updated plan-specified .errors[0].message to .issues[0].message in client server actions - [Phase 03-agent-portal-shell]: updateClient uses bind pattern (id pre-bound) so useActionState passes prevState + formData as remaining args — caller does updateClient.bind(null, clientId) - [Phase 03-agent-portal-shell]: PortalNav is a client component (usePathname requires use client); active link state driven by pathname.startsWith(href) with gold border-b-2 underline - [Phase 03-agent-portal-shell]: DashboardFilters extracted to separate file — use client directive must be at file top in Next.js, cannot be inlined inside server component file - [Phase 03-agent-portal-shell]: ClientsPageClient extracted to _components/ClientsPageClient.tsx for cleaner server/client split following project convention - [Phase 03-agent-portal-shell]: Seed script requires DOTENV_CONFIG_PATH=.env.local — dotenv/config reads .env by default but project uses .env.local - [Phase 03-agent-portal-shell 03-04]: ClientProfileClient extracted to _components/ClientProfileClient.tsx (not inlined) — consistent with project convention for client sub-components - [Phase 03-agent-portal-shell 03-04]: deleteClient called directly from async event handler in client component — Next.js 15+ supports calling server actions as async functions without form wrappers - [Phase 03-agent-portal-shell 03-04]: ConfirmDialog message constructed with client name inline — reusable with title + message string props, no JSX message needed ### Pending Todos None yet. ### Blockers/Concerns - WFRMLS vendor enrollment takes 2-4 weeks — start process immediately, build Phase 2 listings with mock data while waiting - Phase 6 (Signing Flow) warrants a /gsd:research-phase before planning — JWT one-time enforcement + ESIGN/UETA audit + mobile touch has edge cases - DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before any signing link reaches a real client (Phase 6 acceptance criterion) - Exact WFRMLS required IDX disclaimer text must be obtained directly from WFRMLS before listings feature ships (Phase 2) - WFRMLS vendor enrollment takes 2-4 weeks — start process immediately, build Phase 2 listings with mock data while waiting (moved from Blockers) ## Session Continuity Last session: 2026-03-19 Stopped at: Completed 03-04-PLAN.md — Client profile page (edit modal + delete confirmation + documents table) + full Phase 3 portal browser verification (all 5 sections approved) Resume file: None