Commit Graph

70 Commits

Author SHA1 Message Date
Chandler Copeland
9dc6b27174 docs(phase-15): complete phase execution — 3/3 plans, human UAT deferred 2026-04-03 15:56:22 -06:00
Chandler Copeland
db868aebb5 docs(15-03): complete signer-aware sign route plan — atomic completion, accumulate PDF 2026-04-03 15:49:09 -06:00
Chandler Copeland
a19163855b docs(15-02): complete multi-signer send route plan
- SUMMARY.md: multi-signer token loop + legacy fallback route rewrite
- STATE.md: advance to plan 3, record metrics, add decisions
- ROADMAP.md: update phase 15 progress (2/3 plans complete)
- REQUIREMENTS.md: mark MSIGN-05, MSIGN-06 complete
2026-04-03 15:48:01 -06:00
Chandler Copeland
00c5e5df33 docs(15-01): complete multi-signer utility building blocks plan
- SUMMARY.md created for 15-01
- STATE.md: plan advanced to 01/02, progress 94%, decisions added
- ROADMAP.md: phase 15 progress updated (1/3 plans)
- REQUIREMENTS.md: MSIGN-10, MSIGN-11 marked complete
2026-04-03 15:44:37 -06:00
Chandler Copeland
cdb1f4924e docs(14-01): complete multi-signer schema plan — migration 0010 applied
- SUMMARY.md: 2 tasks complete, schema.ts + migration 0010 committed
- STATE.md: advanced to plan 1 complete, decisions logged, 98% progress
- ROADMAP.md: phase 14 marked Complete (1/1 plans)
- REQUIREMENTS.md: MSIGN-08 marked complete
2026-04-03 15:17:25 -06:00
Chandler Copeland
4d69253a94 docs: create milestone v1.2 roadmap (4 phases) 2026-04-03 14:59:31 -06:00
Chandler Copeland
34ee72004b docs: start milestone v1.2 Multi-Signer and Deployment Hardening 2026-04-03 13:48:53 -06:00
Chandler Copeland
136eaf0723 docs(13-03): complete AI Auto-place UI wire-up plan — violet button, aiPlacementKey, handleAiAutoPlace
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 17:10:01 -06:00
Chandler Copeland
970bb4f7cf docs(13-02): complete ai-prepare route plan — POST handler, guard chain, AI pipeline
- 13-02-SUMMARY.md created with accomplishments, decisions, file list
- STATE.md: plan position advanced to 2/4, decisions logged, session updated
- ROADMAP.md: phase 13 progress updated to 2 summaries

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 17:05:37 -06:00
Chandler Copeland
24e1f5aa00 docs(13-01): complete AI foundation layer plan — extract-text, field-placement, unit tests
- Create 13-01-SUMMARY.md with TDD execution results and decisions
- Update STATE.md: phase 13 in progress, plan 1/4 complete
- Update ROADMAP.md: phase 13 status set to In Progress (1/4 summaries)
- Mark AI-01, AI-02 requirements complete in REQUIREMENTS.md

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 17:02:25 -06:00
Chandler Copeland
2f30503a56 docs(phase-12.1): complete phase execution 2026-03-21 16:36:47 -06:00
Chandler Copeland
698b414249 docs(12.1-02): complete per-field text editing and quick-fill plan — human verification approved
- Task 3 (human-verify checkpoint) approved: all 12 verification steps passed
- Updated SUMMARY.md: tasks_completed 3, requirements-completed TXTF-01/02/03, verification section
- STATE.md: Phase 12.1 marked complete; session stopped-at updated; decision recorded
- ROADMAP.md: 12.1-01 and 12.1-02 plans marked complete ([x]); roadmap update-plan-progress confirmed 2/2

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 16:32:30 -06:00
Chandler Copeland
dbca290dbb docs(12.1-02): complete state bridge plan; awaiting human-verify checkpoint
- Create 12.1-02-SUMMARY.md: selectedFieldId + textFillData state lifting; QuickFillPanel replacing TextFillForm
- Update STATE.md: position at checkpoint Task 3 (human verification); 3 new decisions logged
- Update ROADMAP.md: phase 12.1 progress (2/2 SUMMARYs)
- Mark TXTF-02 complete in REQUIREMENTS.md
2026-03-21 16:27:35 -06:00
Chandler Copeland
46c7aaa7d5 docs(12.1-01): complete per-field text fill and click-to-select plan
- SUMMARY.md: document field-ID-keyed text fill and click-to-select interaction
- STATE.md: advance to Phase 12.1 Plan 1 complete; add 3 key decisions
- ROADMAP.md: update phase 12.1 progress (1/2 plans complete)
- REQUIREMENTS.md: mark TXTF-01 and TXTF-03 complete

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 16:23:42 -06:00
Chandler Copeland
db8a63f6a3 docs(phase-12): complete phase execution 2026-03-21 16:01:59 -06:00
Chandler Copeland
513bbe96d8 docs(12-02): complete filled-document-preview plan 02 — PREV-01 human-verified
- Update 12-02-SUMMARY.md: add bug fix commits (43f396b scroll lock+portal, bce2a98 text fill coords), human approval, known gap (Phase 12.1 text fill UX redesign deferred)
- STATE.md: Phase 12 COMPLETE, progress 100% (13/13), add decisions for portal modal, text fill coords, Phase 12.1 gap; update session Stopped At
- ROADMAP.md: Phase 12 marked Complete (2/2 summaries)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 15:58:01 -06:00
Chandler Copeland
422c9a89aa docs(12-02): checkpoint after tasks 1+2 — PreparePanel preview wiring complete
- SUMMARY.md created documenting Tasks 1+2 completion
- STATE.md updated: position at checkpoint:human-verify Task 3
- Decisions recorded: previewToken lifted to DocumentPageClient, wiring pattern
2026-03-21 15:38:18 -06:00
Chandler Copeland
aba622a765 docs(12-01): complete filled-document-preview plan 01
- SUMMARY.md with task commits, decisions, self-check
- STATE.md updated: position advanced to phase 12 plan 1/2 complete
- ROADMAP.md updated: phase 12 in progress (1/2 plans complete)
- PREV-01 marked complete in REQUIREMENTS.md
2026-03-21 15:31:42 -06:00
Chandler Copeland
f3cf24078b docs(phase-11.1): complete phase execution 2026-03-21 15:15:08 -06:00
Chandler Copeland
a9607763fa docs(11.1-03): complete agent-and-client-initials E2E verification plan 2026-03-21 15:08:49 -06:00
Chandler Copeland
babc92be34 docs(11.1-02): complete agent-initials prepare pipeline plan
- Add 11.1-02-SUMMARY.md with plan execution results
- Update STATE.md: current position, session continuity, decisions
- Update ROADMAP.md: phase 11.1 progress (2/3 summaries)
2026-03-21 15:05:00 -06:00
Chandler Copeland
ec7f726cae docs(11.1-01): complete agent initials storage and UI plan
- Create 11.1-01-SUMMARY.md with task commits, decisions, and file inventory
- Update STATE.md: position, decisions (4 recorded), session continuity
- Update ROADMAP.md: phase 11.1 progress (1/3 plans complete, In Progress)
- Mark INIT-01, INIT-02, INIT-03, INIT-04 complete in REQUIREMENTS.md
2026-03-21 15:01:32 -06:00
Chandler Copeland
efa7edddbb docs(phase-11): complete phase execution 2026-03-21 14:39:13 -06:00
Chandler Copeland
e594e27f4e docs(11-03): complete Phase 11 human verification — all AGENT requirements confirmed
- Created 11-03-SUMMARY.md: E2E human verification approved; AGENT-01 through AGENT-04 confirmed live
- Updated STATE.md: Phase 11 complete (11/13 phases), plan 3/3 done, decisions appended
- Updated ROADMAP.md: Phase 11 marked 3/3 Complete

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 14:33:10 -06:00
Chandler Copeland
f8de782a64 docs(11-02): complete agent signature bake-in prepare pipeline plan
- 11-02-SUMMARY.md: preparePdf() embeds agent PNG + prepare route 422 guard
- STATE.md: advance to plan 2 of 3, add phase 11-02 decisions, update metrics
- ROADMAP.md: phase 11 progress updated (2/3 plans complete)
- REQUIREMENTS.md: AGENT-04 marked complete
2026-03-21 14:08:37 -06:00
Chandler Copeland
f1dbf45e37 docs(11-01): complete agent saved signature storage and UI plan
- Create 11-01-SUMMARY.md documenting agentSignatureData DB column, API routes, AgentSignaturePanel, profile page, nav link, FieldPlacer token
- Update STATE.md: advance to Plan 1 of 3, record Phase 11 decisions and metrics
- Update ROADMAP.md: Phase 11 now In Progress (1/3 summaries)
- Mark requirements AGENT-01, AGENT-02, AGENT-03 complete in REQUIREMENTS.md
2026-03-21 14:04:54 -06:00
Chandler Copeland
eeb533e3e0 docs(10-03): complete Phase 10 — expanded field types end-to-end
10-03-SUMMARY.md created. ROADMAP.md marks all phase 10 plans complete.
STATE.md advances to Phase 11 (Agent Saved Signature), 10/13 phases done.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 13:42:28 -06:00
Chandler Copeland
9f190b3fc8 docs(10-01): complete expanded field types palette plan — SUMMARY, STATE, ROADMAP, REQUIREMENTS
- Create 10-01-SUMMARY.md with decisions, deviations, and phase readiness
- Update STATE.md: phase 10 current position, 10-01 decisions recorded
- Update ROADMAP.md: phase 10 plan progress (1/3 plans complete)
- Update REQUIREMENTS.md: mark FIELD-03 complete
2026-03-21 12:52:13 -06:00
Chandler Copeland
9875c1a0af docs(10-02): complete type-branched field rendering and POST handler fix plan
- Create 10-02-SUMMARY.md with decisions, commits, and deviation docs
- Update STATE.md with decisions and metrics
- Update ROADMAP.md phase 10 progress (2/3 summaries)
- Mark FIELD-02 and FIELD-04 requirements complete
2026-03-21 12:51:42 -06:00
Chandler Copeland
d1e4979e1f docs(phase-9): complete phase execution 2026-03-21 12:32:39 -06:00
Chandler Copeland
a784e50e10 docs(09-01): complete client-property-address plan — SUMMARY, STATE, ROADMAP
- 09-01-SUMMARY.md created documenting all 3 tasks and 2 auto-fixed deviations
- STATE.md updated: Phase 9 complete, session continuity, two decisions added
- ROADMAP.md updated: Phase 9 marked Complete (1/1 plans)
- REQUIREMENTS.md: CLIENT-04 and CLIENT-05 marked complete
2026-03-21 12:22:12 -06:00
Chandler Copeland
fbf9e0aa98 docs(phase-08): complete phase execution 2026-03-21 12:00:27 -06:00
Chandler Copeland
0cfe0d9e7a docs(08-02): complete signing page safety plan — Phase 8 fully done
- 08-02-SUMMARY.md: server-side filter + type-branching guards documented
- STATE.md: position advanced to Phase 9, decisions recorded, progress 62%
- ROADMAP.md: Phase 8 marked Complete (2/2 plans)
- REQUIREMENTS.md: FIELD-01 marked complete

Phase 8 ships atomically: schema discriminant (08-01) + boundary enforcement (08-02)
2026-03-21 11:56:15 -06:00
Chandler Copeland
2468fdb21c docs(08-01): complete schema foundation plan — SignatureFieldType discriminant
- Create 08-01-SUMMARY.md with full task documentation and deviation notes
- Update STATE.md: plan 1 of 2 complete, decisions recorded, session updated
- Update ROADMAP.md: phase 8 progress 1/2, 08-01-PLAN.md marked complete
2026-03-21 11:50:09 -06:00
Chandler Copeland
fad91366a5 docs: create milestone v1.1 roadmap (6 phases) 2026-03-21 11:33:52 -06:00
Chandler Copeland
8c69deeb68 docs: start milestone v1.1 smart-document-preparation 2026-03-21 11:15:06 -06:00
Chandler Copeland
5f2507a69e docs(phase-7): complete phase execution and verification 2026-03-21 11:02:37 -06:00
Chandler Copeland
d910288e42 docs(07-04): complete LEGAL-03 gap closure plan — SUMMARY, STATE, ROADMAP updated
- 07-04-SUMMARY.md: plan execution documented
- STATE.md: position advanced to 07-04 complete, decisions added, metrics recorded
- ROADMAP.md: phase 7 progress updated (4/4 plans)
2026-03-21 10:57:03 -06:00
Chandler Copeland
e942a28247 docs(07-03): complete Phase 7 browser verification — Phase 7 complete
- Created 07-03-SUMMARY.md: human verification checkpoint approved
- STATE.md: Phase 7 marked complete (3/3 plans), all 4 criteria verified
- ROADMAP.md: Phase 7 status updated to Complete (3/3 plans)
- SIGN-07 and LEGAL-03 confirmed working end-to-end in live browser

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 10:46:26 -06:00
Chandler Copeland
86ca6dce85 docs(07-02): complete download UI wiring plan — SUMMARY, STATE, ROADMAP updated
- 07-02-SUMMARY.md: documents PreparePanel Signed panel, agentDownloadUrl server-side generation, Date Signed column, and auto-fix of ClientProfileClient type mismatch
- STATE.md: advanced to Phase 7 plan 2 of 3, added 3 key decisions, logged metrics row
- ROADMAP.md: updated phase 7 progress (2/3 plans complete)
2026-03-21 10:40:46 -06:00
Chandler Copeland
36069cb1ef docs(07-01): complete agent download token and route plan
- 07-01-SUMMARY.md: execution summary with decisions and file references
- STATE.md: position updated to Phase 7 Plan 1 complete; two decisions logged
- ROADMAP.md: Phase 7 progress updated (1/3 plans complete)
- REQUIREMENTS.md: SIGN-07 and LEGAL-03 marked complete
2026-03-21 10:36:19 -06:00
Chandler Copeland
04e3d5cb54 docs(06-06): complete DNS verification plan — LEGAL-04 satisfied, Phase 6 complete
- 06-06-SUMMARY.md: SPF/DKIM/DMARC verified green via Resend for tcopelandhomes.com
- STATE.md: Plan 06 complete, completed_plans 24/24, Phase 6 fully complete
- ROADMAP.md: Phase 6 marked complete (6/6 plans), completed 2026-03-21
- REQUIREMENTS.md: LEGAL-04 marked complete

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-21 09:44:23 -06:00
Chandler Copeland
119edc2491 docs(06-05): complete confirmation page + download route plan — SUMMARY, STATE, ROADMAP updated
- Post-signing confirmation page with success checkmark, document name, timestamp, 15-min download token
- GET /api/sign/[token]/download streams signedFilePath PDF via short-lived download JWT
- Phase 6 (signing flow) all 5 plans complete
- SIGN-06 requirement marked complete
2026-03-20 11:44:32 -06:00
Chandler Copeland
5c1ea3568e docs(06-04): complete signature modal + submission plan — SUMMARY, STATE, ROADMAP updated
- SignatureModal with Draw/Type/Use Saved tabs (signature_pad DPR scaling)
- POST /api/sign/[token] atomic one-time claim, PDF embed, SHA-256 hash, audit trail
- SIGN-04, SIGN-05, LEGAL-01, LEGAL-02 requirements complete
2026-03-20 11:39:10 -06:00
Chandler Copeland
a3026fb44f docs(06-03): complete signing page plan — SUMMARY, STATE, ROADMAP updated
- 06-03-SUMMARY.md created with decisions, deviations, file list
- STATE.md advanced to Plan 3 complete; two new decisions recorded
- ROADMAP.md phase 6 updated to 3/6 summaries complete
2026-03-20 11:32:40 -06:00
Chandler Copeland
90bd066016 docs(06-02): complete email delivery layer plan
- Add 06-02-SUMMARY.md: SigningRequestEmail, signing-mailer, send route, prepare audit log
- Update STATE.md: Plan 2 complete, decisions logged, session updated
- Update ROADMAP.md: Phase 6 plan progress (2 of 5 summaries)
- Mark SIGN-01 complete in REQUIREMENTS.md
2026-03-20 11:31:35 -06:00
Chandler Copeland
4bca04f988 docs(06-01): complete signing foundation plan — SUMMARY, STATE, ROADMAP updated
- created 06-01-SUMMARY.md with full task and decision documentation
- STATE.md: advanced to phase 6 plan 1, added 5 signing foundation decisions
- ROADMAP.md: marked 06-01-PLAN.md complete, Signing Flow at 1/6
- REQUIREMENTS.md: marked SIGN-02, LEGAL-01, LEGAL-02 complete
2026-03-20 11:27:07 -06:00
Chandler Copeland
d669b11a50 docs(05-04): update STATE.md with three additional UI fixes
- Ghost-rect field placement fix (f0ecfd1)
- Editable primary email input fix (73ba6d5)
- Text stamp 60pt/10pt fix (c4e8d01)
2026-03-20 00:43:02 -06:00
Chandler Copeland
13cdd150f1 docs(05-04): complete pdf-fill-and-field-mapping plan 04 bug fixes
Four post-testing bugs fixed: signature field placement coordinate math,
delete button clickability, client selector pre-selection with manual
email entry, and text fill fallback to drawText for flat PDFs.
SUMMARY.md updated with full bug fix documentation.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-20 00:24:50 -06:00
Chandler Copeland
5bd77c1368 docs(05-04): complete pdf-fill-and-field-mapping plan 04 checkpoint
- Created 05-04-SUMMARY.md documenting Phase 5 human verification checkpoint
- Updated STATE.md: checkpoint:human-verify reached, awaiting sign-off on 10-step browser verification
- All Phase 5 implementation (DOC-04, DOC-05, DOC-06) complete in plans 05-01 through 05-03

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-20 00:09:26 -06:00