docs(10-03): complete Phase 10 — expanded field types end-to-end
10-03-SUMMARY.md created. ROADMAP.md marks all phase 10 plans complete. STATE.md advances to Phase 11 (Agent Saved Signature), 10/13 phases done. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -2,13 +2,13 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.1
|
||||
milestone_name: Smart Document Preparation
|
||||
status: unknown
|
||||
last_updated: "2026-03-21T18:51:29.718Z"
|
||||
status: in_progress
|
||||
last_updated: "2026-03-21T20:00:00.000Z"
|
||||
progress:
|
||||
total_phases: 10
|
||||
completed_phases: 9
|
||||
total_phases: 13
|
||||
completed_phases: 10
|
||||
total_plans: 34
|
||||
completed_plans: 33
|
||||
completed_plans: 34
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -18,16 +18,16 @@ progress:
|
||||
See: .planning/PROJECT.md (updated 2026-03-21)
|
||||
|
||||
**Core value:** Teressa can prepare and send any real estate form to a client for signing in minutes, from her browser, without leaving her site.
|
||||
**Current focus:** Phase 10 — Expanded Field Types End-to-End
|
||||
**Current focus:** Phase 11 — Agent Saved Signature and Signing Workflow
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 10 of 13 (Expanded Field Types End-to-End) — IN PROGRESS
|
||||
Plan: 1 of 3 in phase 10 (10-01 complete — 5-token typed palette, handleDragEnd with correct types and checkbox 24x24pt, renderFields with per-type colors and labels)
|
||||
Status: In progress
|
||||
Last activity: 2026-03-21 — 10-01 complete: parameterized DraggableToken, PALETTE_TOKENS with 5 typed tokens, isDraggingToken string|null for per-type DragOverlay, handleDragEnd writes type property + checkbox 24x24pt, renderFields per-type label/color
|
||||
Phase: 11 of 13 (Agent Saved Signature and Signing Workflow) — NOT STARTED
|
||||
Plan: 0 of 3 in phase 11
|
||||
Status: Ready to plan
|
||||
Last activity: 2026-03-21 — Phase 10 complete: all 4 expanded field types (text, checkbox, initials, date) place, prepare, sign, and embed correctly. Human verification approved.
|
||||
|
||||
Progress: [█████████░░░░] 69% (9/13 phases complete — phase 10 in progress)
|
||||
Progress: [██████████░░░] 77% (10/13 phases complete)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
@@ -69,6 +69,9 @@ Recent decisions affecting v1.1 work:
|
||||
- [Phase 09-client-property-address]: Empty string from FormData coerced to NULL via || null before DB write — blank optional fields never store empty string in postgres
|
||||
- [Phase 10-expanded-field-types-end-to-end]: date field signing date captured server-side (now hoisted before step 8) — not trusted from client payload
|
||||
- [Phase 10-expanded-field-types-end-to-end]: signableFields filter limits POST signaturesWithCoords to client-signature and initials only — eliminates 500 on mixed-field documents
|
||||
- [Phase 10-expanded-field-types-end-to-end]: all field box backgrounds transparent in preparePdf — omit color param from drawRectangle = no fill; underlying PDF content always visible
|
||||
- [Phase 10-expanded-field-types-end-to-end]: checkbox draws X lines only (no rectangle); FieldPlacer hides resize handles for checkbox (fixed 24x24pt, non-resizable)
|
||||
- [Phase 10-expanded-field-types-end-to-end]: date stamp at sign time draws text directly — no white overwrite rectangle needed since no placeholder was drawn at prepare time
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -82,5 +85,5 @@ None yet.
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-21
|
||||
Stopped at: Completed 10-01-PLAN.md — 5-token typed palette, per-type DragOverlay ghost, typed handleDragEnd (checkbox 24x24pt, others 144x36pt), renderFields per-type label and color
|
||||
Stopped at: Phase 10 complete (human verification approved). Ready to plan Phase 11.
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue
Block a user