docs(07-03): complete Phase 7 browser verification — Phase 7 complete
- Created 07-03-SUMMARY.md: human verification checkpoint approved - STATE.md: Phase 7 marked complete (3/3 plans), all 4 criteria verified - ROADMAP.md: Phase 7 status updated to Complete (3/3 plans) - SIGN-07 and LEGAL-03 confirmed working end-to-end in live browser Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
100
.planning/phases/07-audit-trail-and-download/07-03-SUMMARY.md
Normal file
100
.planning/phases/07-audit-trail-and-download/07-03-SUMMARY.md
Normal file
@@ -0,0 +1,100 @@
|
||||
---
|
||||
phase: 07-audit-trail-and-download
|
||||
plan: "03"
|
||||
subsystem: ui
|
||||
|
||||
tags: [next.js, jwt, pdf, download, security, human-verify]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 07-audit-trail-and-download
|
||||
plan: "02"
|
||||
provides: PreparePanel Signed panel with Download Signed PDF anchor, agentDownloadUrl generated server-side, DocumentsTable Date Signed column
|
||||
- phase: 07-audit-trail-and-download
|
||||
plan: "01"
|
||||
provides: GET /api/documents/[id]/download route with 5-min presigned JWT and path traversal guard
|
||||
provides:
|
||||
- Human verification that all Phase 7 success criteria pass (download, Signed badge, private storage, access control)
|
||||
- Phase 7 marked complete — SIGN-07 and LEGAL-03 confirmed working in browser
|
||||
affects: []
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- Human-verify checkpoint pattern — code complete from prior plans; agent observes behavior, reports pass/fail against named criteria
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "Phase 7 declared complete after human agent confirmed all 4 browser verification criteria pass — download, Signed badge, private storage 404, and access-control all verified"
|
||||
|
||||
patterns-established: []
|
||||
|
||||
requirements-completed:
|
||||
- SIGN-07
|
||||
- LEGAL-03
|
||||
|
||||
# Metrics
|
||||
duration: 0min
|
||||
completed: 2026-03-21
|
||||
---
|
||||
|
||||
# Phase 7 Plan 03: Full Phase 7 Browser Verification Summary
|
||||
|
||||
**All four Phase 7 browser verification criteria passed — agent download, Signed badge, private storage guard, and download-only-for-Signed confirmed working**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** < 1 min (human verification checkpoint, no code changes)
|
||||
- **Started:** 2026-03-21
|
||||
- **Completed:** 2026-03-21
|
||||
- **Tasks:** 1 (checkpoint:human-verify)
|
||||
- **Files modified:** 0
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Human agent verified that the "Download Signed PDF" button appears on Signed documents and that clicking it downloads the actual signed PDF with the drawn signature embedded
|
||||
- Human agent confirmed that the Status badge shows "Signed" and the Date Signed column is non-empty on the dashboard for signed documents
|
||||
- Human agent confirmed that /uploads/ and /uploads/clients/ return 404 — private storage guard is in effect and files are not accessible via guessable URLs
|
||||
- Human agent confirmed that Draft, Sent, and Viewed documents do NOT show a Download Signed PDF button
|
||||
|
||||
## Task Commits
|
||||
|
||||
No code was changed in this plan — verification only.
|
||||
|
||||
1. **Task 1: Full Phase 7 browser verification** — checkpoint:human-verify, approved by human
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
None — this plan is a human verification checkpoint with no code changes.
|
||||
|
||||
## Decisions Made
|
||||
|
||||
- Phase 7 declared complete after human confirmation of all 4 browser verification criteria
|
||||
- SIGN-07 and LEGAL-03 confirmed satisfied in the live browser environment
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- Phase 7 (Audit Trail and Download) is complete. All v1 signing-related requirements are satisfied.
|
||||
- All 28 v1 requirements are mapped and verified complete.
|
||||
- Remaining incomplete phases: Phase 2 (Marketing Site) and Phase 5 (PDF Fill and Field Mapping) have open plans, but the core signing flow is production-ready.
|
||||
- No blockers for Phase 7 — the full signing ceremony (send, sign, download) is end-to-end verified.
|
||||
|
||||
---
|
||||
*Phase: 07-audit-trail-and-download*
|
||||
*Completed: 2026-03-21*
|
||||
Reference in New Issue
Block a user