docs: create milestone v1.3 roadmap (3 phases, 16 requirements)

This commit is contained in:
Chandler Copeland
2026-04-06 12:05:21 -06:00
parent 05d531a929
commit caf9acf0c2
3 changed files with 106 additions and 18 deletions

View File

@@ -270,14 +270,31 @@ Which phases cover which requirements. Updated during roadmap creation.
| DEPLOY-03 | Phase 17 | Complete | | DEPLOY-03 | Phase 17 | Complete |
| DEPLOY-04 | Phase 17 | Complete | | DEPLOY-04 | Phase 17 | Complete |
| DEPLOY-05 | Phase 17 | Complete | | DEPLOY-05 | Phase 17 | Complete |
| TMPL-01 | Phase 18 | Pending |
| TMPL-02 | Phase 18 | Pending |
| TMPL-03 | Phase 18 | Pending |
| TMPL-04 | Phase 18 | Pending |
| TMPL-05 | Phase 19 | Pending |
| TMPL-06 | Phase 19 | Pending |
| TMPL-07 | Phase 19 | Pending |
| TMPL-08 | Phase 19 | Pending |
| TMPL-09 | Phase 19 | Pending |
| TMPL-10 | Phase 20 | Pending |
| TMPL-11 | Phase 20 | Pending |
| TMPL-12 | Phase 20 | Pending |
| TMPL-13 | Phase 20 | Pending |
| TMPL-14 | Phase 20 | Pending |
| TMPL-15 | Phase 20 | Pending |
| TMPL-16 | Phase 20 | Pending |
**Coverage:** **Coverage:**
- v1.0 requirements: 28 total — mapped to phases 1-7 — all Complete - v1.0 requirements: 28 total — mapped to phases 1-7 — all Complete
- v1.1 requirements: 17 total — mapped to phases 8-13 — 15 Complete, 2 In Progress (AI-01, AI-02) - v1.1 requirements: 17 total — mapped to phases 8-13 — 15 Complete, 2 In Progress (AI-01, AI-02)
- v1.2 requirements: 16 total — mapped to phases 14-17 — all Pending - v1.2 requirements: 16 total — mapped to phases 14-17 — all Pending
- Total mapped: 61 - v1.3 requirements: 16 total mapped to phases 18-20 — all Pending
- Total mapped: 77
- Unmapped: 0 - Unmapped: 0
--- ---
*Requirements defined: 2026-03-19* *Requirements defined: 2026-03-19*
*Last updated: 2026-04-03 — v1.2 traceability added (MSIGN-0111 → Phases 1416, DEPLOY-0105 → Phase 17)* *Last updated: 2026-04-06 — v1.3 traceability added (TMPL-0104 → Phase 18, TMPL-0509 → Phase 19, TMPL-1016 → Phase 20)*

View File

@@ -8,11 +8,14 @@ v1.1 extends the platform with AI-assisted field placement, expanded field types
v1.2 extends the platform to multiple signers in parallel and ships a production-ready Docker Compose deployment with correct SMTP and secret injection. v1.2 extends the platform to multiple signers in parallel and ships a production-ready Docker Compose deployment with correct SMTP and secret injection.
v1.3 adds a document template system — agent creates reusable field layouts with signer role labels and text hints, then applies them when starting new client documents so the same PDF never needs to be field-mapped from scratch.
## Milestones ## Milestones
-**v1.0 Core Document Signing Platform** - Phases 1-7 (shipped 2026-03-21) -**v1.0 Core Document Signing Platform** - Phases 1-7 (shipped 2026-03-21)
- 🚧 **v1.1 Smart Document Preparation** - Phases 8-13 (in progress) - 🚧 **v1.1 Smart Document Preparation** - Phases 8-13 (in progress)
- 📋 **v1.2 Multi-Signer and Deployment Hardening** - Phases 14-17 (planned) - 📋 **v1.2 Multi-Signer and Deployment Hardening** - Phases 14-17 (planned)
- 📋 **v1.3 Document Templates** - Phases 18-20 (planned)
## Phases ## Phases
@@ -179,6 +182,14 @@ Plans:
- [x] **Phase 16: Multi-Signer UI** - PreparePanel signer list, FieldPlacer signer assignment and color-coding, send-block validation, per-signer dashboard status (completed 2026-04-03) - [x] **Phase 16: Multi-Signer UI** - PreparePanel signer list, FieldPlacer signer assignment and color-coding, send-block validation, per-signer dashboard status (completed 2026-04-03)
- [x] **Phase 17: Docker Deployment** - Three-stage Dockerfile, docker-compose.yml with named uploads volume and env_file secrets, health endpoint, SMTP fix (completed 2026-04-03) - [x] **Phase 17: Docker Deployment** - Three-stage Dockerfile, docker-compose.yml with named uploads volume and env_file secrets, health endpoint, SMTP fix (completed 2026-04-03)
### 📋 v1.3 Document Templates (Planned)
**Milestone Goal:** Agent creates reusable document templates with pre-placed fields (including AI auto-placement) so the same PDF never needs to be field-mapped from scratch for every client.
- [ ] **Phase 18: Template Schema and CRUD API** - New `document_templates` table with Drizzle migration; list, create, rename, and soft-delete API routes
- [ ] **Phase 19: Template Editor UI** - FieldPlacer `onPersist` abstraction, template editor page at `/portal/templates/[id]`, AI auto-place wired to template context, signer role label support, save template
- [ ] **Phase 20: Apply Template and Portal Nav** - "Start from template" option in AddDocumentModal, apply operation with field snapshot and role-to-email mapping, text hint quick-fill, Templates portal nav section and list page
## Phase Details ## Phase Details
### Phase 8: Schema Foundation and Signing Page Safety ### Phase 8: Schema Foundation and Signing Page Safety
@@ -359,10 +370,6 @@ Plans:
- [ ] 16-04-PLAN.md — Dashboard N/M signed badge (signingTokens count query, DocumentsTable badge rendering) - [ ] 16-04-PLAN.md — Dashboard N/M signed badge (signingTokens count query, DocumentsTable badge rendering)
**UI hint**: yes **UI hint**: yes
### Phase 17: Docker Deployment ### Phase 17: Docker Deployment
**Goal**: The application runs reliably in a Docker container on the production server — secrets are injected at runtime, email delivers correctly, uploaded files survive container restarts, and a health check confirms database connectivity **Goal**: The application runs reliably in a Docker container on the production server — secrets are injected at runtime, email delivers correctly, uploaded files survive container restarts, and a health check confirms database connectivity
**Depends on**: Phase 16 **Depends on**: Phase 16
@@ -380,10 +387,48 @@ Plans:
- [x] 17-02-PLAN.md — Dockerfile (three-stage, node:20-slim, linux/amd64), docker-compose.yml (env_file, DNS fix, named volume), .dockerignore, .env.production.example - [x] 17-02-PLAN.md — Dockerfile (three-stage, node:20-slim, linux/amd64), docker-compose.yml (env_file, DNS fix, named volume), .dockerignore, .env.production.example
**UI hint**: no **UI hint**: no
### Phase 18: Template Schema and CRUD API
**Goal**: The `document_templates` table exists in the database and agents can create, rename, list, and soft-delete templates via API — every subsequent template feature depends on this foundation
**Depends on**: Phase 17
**Requirements**: TMPL-01, TMPL-02, TMPL-03, TMPL-04
**Success Criteria** (what must be TRUE):
1. Agent can create a new template by selecting a PDF from the forms library — a `document_templates` row is inserted with the chosen `formTemplateId` FK and an empty field layout
2. Agent can rename a template and the new name is persisted and reflected immediately in the template list
3. Agent can delete a template — the row is soft-deleted (`archivedAt` set, not removed from DB) and disappears from the active list; no `ON DELETE CASCADE` touches any documents created from it
4. Agent can retrieve a list of all active templates showing form name and field count — archived templates are filtered out
**Plans**: TBD
**UI hint**: no
### Phase 19: Template Editor UI
**Goal**: Agent can open any template in a full field-placement editor, use AI auto-place, assign signer role labels instead of real emails, set text hints on text fields, and save the template — reusing the existing FieldPlacer component without duplication
**Depends on**: Phase 18
**Requirements**: TMPL-05, TMPL-06, TMPL-07, TMPL-08, TMPL-09
**Success Criteria** (what must be TRUE):
1. Agent can open a template at `/portal/templates/[id]` and see the source PDF rendered with any previously saved fields overlaid — the editor uses the existing FieldPlacer drag-drop interface unchanged
2. Agent can click "AI Auto-place" in the template editor and fields are placed on the template (routed through a `/api/templates/[id]/ai-prepare` route, not the document route)
3. Signer assignment in the template editor accepts role labels ("Buyer", "Seller", "Agent") rather than email addresses — role strings are stored in the `signerEmail` slot and the editor does not reject them as invalid emails
4. Agent can set a text hint on any text field — the hint is stored in the template and is visible as a placeholder label in the editor
5. Agent can click Save and the current field layout (with role labels and text hints) is persisted to `document_templates.signatureFields` — a subsequent page reload shows the saved state
**Plans**: TBD
**UI hint**: yes
### Phase 20: Apply Template and Portal Nav
**Goal**: Agent can start any new client document from a saved template — all fields are pre-loaded with fresh IDs, roles map to real signer emails, text hints appear as quick-fill suggestions — and "Templates" is a top-level portal destination
**Depends on**: Phase 19
**Requirements**: TMPL-10, TMPL-11, TMPL-12, TMPL-13, TMPL-14, TMPL-15, TMPL-16
**Success Criteria** (what must be TRUE):
1. "Start from template" tab is available in AddDocumentModal; agent can pick a template from the list and create a document with all template fields pre-loaded at their saved positions
2. Every field copied from the template has a freshly generated UUID — none of the template's original field IDs appear in the new document; editing the template afterward does not change the document's fields
3. Template signer roles are automatically pre-mapped to the client's contacts (first role to primary contact, second role to co-buyer if present); agent can override any mapping before sending
4. Text hints from the template appear as quick-fill suggestion buttons in the new document's PreparePanel
5. "Templates" appears in the portal top nav and `/portal/templates` lists all active templates with form name, field count, and last-updated date
**Plans**: TBD
**UI hint**: yes
## Progress ## Progress
**Execution Order:** **Execution Order:**
Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 → 9 → 10 → 11 → 11.1 → 12 → 12.1 → 13 → 14 → 15 → 16 → 17 Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 → 9 → 10 → 11 → 11.1 → 12 → 12.1 → 13 → 14 → 15 → 16 → 17 → 18 → 19 → 20
| Phase | Milestone | Plans Complete | Status | Completed | | Phase | Milestone | Plans Complete | Status | Completed |
|-------|-----------|----------------|--------|-----------| |-------|-----------|----------------|--------|-----------|
@@ -406,3 +451,6 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 15. Multi-Signer Backend | v1.2 | 3/3 | Complete | 2026-04-03 | | 15. Multi-Signer Backend | v1.2 | 3/3 | Complete | 2026-04-03 |
| 16. Multi-Signer UI | v1.2 | 1/4 | Complete | 2026-04-03 | | 16. Multi-Signer UI | v1.2 | 1/4 | Complete | 2026-04-03 |
| 17. Docker Deployment | v1.2 | 2/2 | Complete | 2026-04-03 | | 17. Docker Deployment | v1.2 | 2/2 | Complete | 2026-04-03 |
| 18. Template Schema and CRUD API | v1.3 | 0/TBD | Not started | - |
| 19. Template Editor UI | v1.3 | 0/TBD | Not started | - |
| 20. Apply Template and Portal Nav | v1.3 | 0/TBD | Not started | - |

View File

@@ -2,16 +2,16 @@
gsd_state_version: 1.0 gsd_state_version: 1.0
milestone: v1.3 milestone: v1.3
milestone_name: Document Templates milestone_name: Document Templates
status: defining requirements status: roadmap defined
stopped_at: Milestone v1.3 started — Document Templates stopped_at: v1.3 roadmap created — Phases 18-20 defined, ready for plan-phase 18
last_updated: "2026-04-06T00:00:00.000Z" last_updated: "2026-04-06T00:00:00.000Z"
last_activity: 2026-04-06 last_activity: 2026-04-06
progress: progress:
total_phases: 19 total_phases: 22
completed_phases: 18 completed_phases: 18
total_plans: 58 total_plans: 58
completed_plans: 57 completed_plans: 57
percent: 100 percent: 82
--- ---
# Project State # Project State
@@ -24,10 +24,10 @@ See: .planning/PROJECT.md (updated 2026-04-03)
## Current Position ## Current Position
Phase: 17 (docker-deployment) — EXECUTING Phase: 18 (template-schema-and-crud-api) — NOT STARTED
Plan: 2 of 2 Plan: 0 of TBD
Status: Phase complete — ready for verification Status: Roadmap defined — awaiting plan-phase 18
Last activity: 2026-04-03 Last activity: 2026-04-06
## Note on v1.1 ## Note on v1.1
@@ -44,14 +44,25 @@ v1.2 (Multi-Signer and Deployment Hardening) roadmap is defined. Four phases pla
Start v1.2 after Phase 13 Plan 04 completes: `/gsd:plan-phase 14` Start v1.2 after Phase 13 Plan 04 completes: `/gsd:plan-phase 14`
## Note on v1.3
v1.3 (Document Templates) roadmap created 2026-04-06. Three phases planned:
- Phase 18: Template Schema and CRUD API — `document_templates` table (Drizzle migration), GET/POST/PATCH/DELETE API routes, soft-delete pattern
- Phase 19: Template Editor UI — FieldPlacer `onPersist` abstraction, template editor page, AI auto-place via `/api/templates/[id]/ai-prepare`, signer role label support, save
- Phase 20: Apply Template and Portal Nav — "Start from template" in AddDocumentModal, field snapshot with fresh UUIDs, role-to-email mapping, text hint quick-fill, Templates nav + list page
Start v1.3 with: `/gsd:plan-phase 18`
## Accumulated Context ## Accumulated Context
### Roadmap Evolution ### Roadmap Evolution
- Phase 11.1 inserted after Phase 11: Agent and Client Initials (URGENT) - Phase 11.1 inserted after Phase 11: Agent and Client Initials (URGENT)
- v1.2 roadmap created 2026-04-03: Phases 14-17 (Multi-Signer + Docker Deployment) - v1.2 roadmap created 2026-04-03: Phases 14-17 (Multi-Signer + Docker Deployment)
- v1.3 roadmap created 2026-04-06: Phases 18-20 (Document Templates)
Progress: [█████████████] 100% (13/13 phases complete — v1.1 scope) Progress: [████████████░░░] 82% (18/22 phases complete — counting v1.3 scope)
## Performance Metrics ## Performance Metrics
@@ -189,6 +200,17 @@ Recent decisions affecting v1.1 work:
- [v1.2 Research]: Neon connection pool set to max:5 — prevents connection exhaustion on free tier - [v1.2 Research]: Neon connection pool set to max:5 — prevents connection exhaustion on free tier
- [v1.2 Research]: @vercel/blob is a dead dependency — remove before Phase 17 to prevent accidental use in Docker deployment - [v1.2 Research]: @vercel/blob is a dead dependency — remove before Phase 17 to prevent accidental use in Docker deployment
### v1.3 Pre-decisions (from research)
- [v1.3 Research]: `document_templates` is a separate table from `form_templates` — form_templates is read-only seeded catalog; document_templates is agent-authored field layouts; FK from new to old
- [v1.3 Research]: Template fields carry signer role labels ("Buyer", "Seller") in the signerEmail slot — the apply operation enforces a complete role-to-email map before DB INSERT; email format validation must not run during template editing
- [v1.3 Research]: Field ID collision prevention is mandatory — stamp fresh crypto.randomUUID() on every field at apply time; template field IDs must never appear in documents
- [v1.3 Research]: `hint` vs `textFillData` distinction — hint is a placeholder label stored in template; textFillData holds values burned into PDFs; never store hints in textFillData
- [v1.3 Research]: Soft-delete only (`archivedAt` column) — no hard deletes; list API filters `archivedAt IS NULL`; documents.formTemplateId is lineage metadata only, no ON DELETE CASCADE
- [v1.3 Research]: FieldPlacer `onPersist` callback is a non-breaking addition — existing document consumers pass no prop, behavior unchanged; template editor passes the callback to save to document_templates
- [v1.3 Research]: `updatedAt` must be set explicitly in update queries — no DB trigger; follows existing pattern in all current tables
- [v1.3 Research]: Single non-agent signer role auto-maps to assigned client email — reduces friction for solo-agent single-signer templates; agent can override
### Pending Todos ### Pending Todos
None yet. None yet.
@@ -197,9 +219,10 @@ None yet.
- [Phase 12 - CARRY FORWARD]: Deployment target confirmed as Docker (Phase 17 addresses this) — write-to-disk preview pattern is valid for self-hosted container - [Phase 12 - CARRY FORWARD]: Deployment target confirmed as Docker (Phase 17 addresses this) — write-to-disk preview pattern is valid for self-hosted container
- [Phase 13]: AI coordinate accuracy on real Utah forms is untested — integration test with full 20-page Utah REPC required before Phase 13 ships - [Phase 13]: AI coordinate accuracy on real Utah forms is untested — integration test with full 20-page Utah REPC required before Phase 13 ships
- [Phase 19 - PRE-DECISION NEEDED]: Confirm whether FieldPlacer has any `z.string().email()` or similar validation on `signerEmail` before Phase 19 begins — if so, introduce `mode: "template" | "document"` prop alongside `onPersist`
## Session Continuity ## Session Continuity
Last session: 2026-04-03T22:58:03.579Z Last session: 2026-04-06T00:00:00.000Z
Stopped at: Completed 17-02-PLAN.md — Dockerfile, docker-compose.yml, .dockerignore, .env.production.example, DEPLOYMENT.md Stopped at: v1.3 roadmap created — Phases 18-20 defined; ROADMAP.md, STATE.md, REQUIREMENTS.md updated
Resume file: None Resume file: None