docs(11.1-03): complete agent-and-client-initials E2E verification plan
This commit is contained in:
@@ -0,0 +1,127 @@
|
||||
---
|
||||
phase: 11.1-agent-and-client-initials
|
||||
plan: "03"
|
||||
subsystem: testing
|
||||
tags: [e2e-verification, agent-initials, client-initials, signing-workflow]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 11.1-agent-and-client-initials
|
||||
plan: "01"
|
||||
provides: agentInitialsData column, GET/PUT /api/agent/initials, AgentInitialsPanel, orange palette token, isClientVisibleField() security boundary
|
||||
- phase: 11.1-agent-and-client-initials
|
||||
plan: "02"
|
||||
provides: preparePdf() agentInitialsData param with embed-once-draw-many, 422 guard in prepare route, single DB query fetch
|
||||
provides:
|
||||
- Human end-to-end verification confirming all four INIT requirements satisfied in live portal testing
|
||||
- Phase 11.1 marked complete
|
||||
affects: []
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns: []
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "No code changes in Plan 03 — all deliverables were complete in Plans 01 and 02; Plan 03 is pure human E2E verification"
|
||||
- "All four INIT requirements (INIT-01 through INIT-04) verified by human in a single 5-step live test"
|
||||
|
||||
patterns-established: []
|
||||
|
||||
requirements-completed: [INIT-01, INIT-02, INIT-03, INIT-04]
|
||||
|
||||
# Metrics
|
||||
duration: <1min
|
||||
completed: 2026-03-21
|
||||
---
|
||||
|
||||
# Phase 11.1 Plan 03: Human E2E Verification Summary
|
||||
|
||||
**All four INIT requirements confirmed working end-to-end by human: agent draws/saves initials, initials embedded in prepared PDF at placed field coordinates, agent-initials absent from client signing session, existing client-initials flow unaffected**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** <1 min (human verification checkpoint)
|
||||
- **Started:** 2026-03-21
|
||||
- **Completed:** 2026-03-21
|
||||
- **Tasks:** 1 (human verification checkpoint — approved)
|
||||
- **Files modified:** 0
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- INIT-01 verified: Agent drew and saved initials on /portal/profile; thumbnail visible with "Update Initials" button
|
||||
- INIT-02 verified: "Update Initials" flow replaces saved initials with a new one; thumbnail updates correctly
|
||||
- INIT-03 verified: Orange "Agent Initials" token visible in FieldPlacer palette; initials PNG embedded in prepared PDF at placed field coordinates; agent-initials field absent from client signing session
|
||||
- INIT-04 verified: Existing purple "Initials" client token unchanged; client still prompted to initial during signing; modal shows "Add Initials"; initials embedded correctly in signed PDF
|
||||
|
||||
## Task Commits
|
||||
|
||||
No code commits in this plan — all implementation was completed in Plans 01 and 02.
|
||||
|
||||
**Plan metadata:** (included in final docs commit)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
None — this plan contains no code changes. All deliverables were shipped in Plans 01 and 02.
|
||||
|
||||
## Decisions Made
|
||||
|
||||
- No code changes in Plan 03 — all deliverables were complete in Plans 01 and 02; this plan is pure human E2E verification
|
||||
- All four INIT requirements verified by human in a single 5-step live test on 2026-03-21
|
||||
|
||||
## Verification Steps Passed
|
||||
|
||||
**Step 1 — Save agent initials (INIT-01):**
|
||||
- /portal/profile shows both "Agent Signature" section (existing, unchanged) AND new "Agent Initials" section below it
|
||||
- Drawing initials on the canvas and clicking "Save Initials" replaces canvas with thumbnail and "Update Initials" button
|
||||
|
||||
**Step 2 — Update agent initials (INIT-02):**
|
||||
- "Update Initials" opens canvas; drawing and saving new initials replaces old thumbnail with new one
|
||||
|
||||
**Step 3 — Place agent-initials field and prepare (INIT-03):**
|
||||
- Orange "Agent Initials" token visible in FieldPlacer palette (7th token, distinct from purple "Initials" client token)
|
||||
- Dragging token places orange field box on PDF
|
||||
- Prepare succeeds (no 422 error)
|
||||
- Downloaded prepared PDF shows initials PNG embedded at the correct position
|
||||
|
||||
**Step 4 — Confirm agent-initials absent from client signing page (INIT-03):**
|
||||
- Client signing link shows no interactive overlay at agent-initials field position
|
||||
- Client-signature and initials overlays (if placed) still appear normally for the client
|
||||
|
||||
**Step 5 — Confirm client-initials unchanged (INIT-04):**
|
||||
- Purple "Initials" token still works in FieldPlacer
|
||||
- Prepare embeds purple placeholder at correct coordinates
|
||||
- Client signing session shows interactive initials overlay
|
||||
- "Add Initials" modal opens; submitted initials embedded correctly in signed PDF
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written (checkpoint approved, no code changes).
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- Phase 11.1 is complete. All four INIT requirements (INIT-01 through INIT-04) are satisfied and confirmed by live human testing.
|
||||
- Phase 12 (deployment) pending confirmation of deployment target (Vercel serverless vs. self-hosted container) — see existing blocker in STATE.md.
|
||||
- Phase 13 (AI coordinate accuracy) still requires integration test with full Utah REPC before ship.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- SUMMARY.md created at .planning/phases/11.1-agent-and-client-initials/11.1-03-SUMMARY.md
|
||||
- No code commits expected in this plan (human-verify checkpoint only)
|
||||
- Plans 01 and 02 commits exist: 33f499c, d9f618f (plan 01), fae1cf1, c876579 (plan 02)
|
||||
|
||||
---
|
||||
*Phase: 11.1-agent-and-client-initials*
|
||||
*Completed: 2026-03-21*
|
||||
Reference in New Issue
Block a user