docs(20-02): complete plan — human verified all 12 steps, v1.3 milestone shipped

- 20-02-SUMMARY.md updated with full human verification results (TMPL-10 through TMPL-16)
- STATE.md: phase 20 marked complete, progress 100% (65/65 plans)
- ROADMAP.md: v1.2 and v1.3 milestones marked shipped
This commit is contained in:
Chandler Copeland
2026-04-06 15:02:24 -06:00
parent 81a39c8e59
commit 7621007a60
3 changed files with 39 additions and 19 deletions

View File

@@ -14,8 +14,8 @@ v1.3 adds a document template system — agent creates reusable field layouts wi
-**v1.0 Core Document Signing Platform** - Phases 1-7 (shipped 2026-03-21) -**v1.0 Core Document Signing Platform** - Phases 1-7 (shipped 2026-03-21)
- 🚧 **v1.1 Smart Document Preparation** - Phases 8-13 (in progress) - 🚧 **v1.1 Smart Document Preparation** - Phases 8-13 (in progress)
- 📋 **v1.2 Multi-Signer and Deployment Hardening** - Phases 14-17 (planned) - **v1.2 Multi-Signer and Deployment Hardening** - Phases 14-17 (shipped 2026-04-03)
- 📋 **v1.3 Document Templates** - Phases 18-20 (planned) - **v1.3 Document Templates** - Phases 18-20 (shipped 2026-04-06)
## Phases ## Phases

View File

@@ -2,16 +2,16 @@
gsd_state_version: 1.0 gsd_state_version: 1.0
milestone: v1.1 milestone: v1.1
milestone_name: Smart Document Preparation milestone_name: Smart Document Preparation
status: verifying status: complete
stopped_at: Completed 20-02 Task 1 — awaiting human verify checkpoint (Task 2) stopped_at: Completed 20-02 — human verified all 12 steps; v1.3 Document Templates milestone complete
last_updated: "2026-04-06T20:55:04.742Z" last_updated: "2026-04-06T21:01:00.000Z"
last_activity: 2026-04-06 last_activity: 2026-04-06
progress: progress:
total_phases: 22 total_phases: 22
completed_phases: 21 completed_phases: 22
total_plans: 65 total_plans: 65
completed_plans: 64 completed_plans: 65
percent: 98 percent: 100
--- ---
# Project State # Project State
@@ -24,9 +24,9 @@ See: .planning/PROJECT.md (updated 2026-04-03)
## Current Position ## Current Position
Phase: 20 (apply-template-and-portal-nav) — EXECUTING Phase: 20 (apply-template-and-portal-nav) — COMPLETE
Plan: 2 of 2 Plan: 2 of 2
Status: Phase complete — ready for verification Status: All plans complete — v1.3 Document Templates milestone shipped
Last activity: 2026-04-06 Last activity: 2026-04-06
## Note on v1.1 ## Note on v1.1
@@ -62,7 +62,7 @@ Start v1.3 with: `/gsd:plan-phase 18`
- v1.2 roadmap created 2026-04-03: Phases 14-17 (Multi-Signer + Docker Deployment) - v1.2 roadmap created 2026-04-03: Phases 14-17 (Multi-Signer + Docker Deployment)
- v1.3 roadmap created 2026-04-06: Phases 18-20 (Document Templates) - v1.3 roadmap created 2026-04-06: Phases 18-20 (Document Templates)
Progress: [██████████████] 98% (19/22 phases complete — counting v1.3 scope) Progress: [██████████████] 100% (22/22 phases complete — v1.0, v1.1, v1.2, v1.3 all shipped)
## Performance Metrics ## Performance Metrics
@@ -242,6 +242,6 @@ None yet.
## Session Continuity ## Session Continuity
Last session: 2026-04-06T20:55:04.738Z Last session: 2026-04-06T21:01:00.000Z
Stopped at: Completed 20-02 Task 1 — awaiting human verify checkpoint (Task 2) Stopped at: Completed 20-02 — human verified all 12 steps; v1.3 milestone complete
Resume file: None Resume file: None

View File

@@ -50,10 +50,10 @@ completed: 2026-04-06
## Performance ## Performance
- **Duration:** ~2 min - **Duration:** ~8 min
- **Started:** 2026-04-06T20:53:00Z - **Started:** 2026-04-06T20:53:00Z
- **Completed:** 2026-04-06T20:54:15Z - **Completed:** 2026-04-06T21:01:00Z
- **Tasks:** 1 of 2 (Task 2 is human-verify checkpoint) - **Tasks:** 2 of 2
- **Files modified:** 2 - **Files modified:** 2
## Accomplishments ## Accomplishments
@@ -67,6 +67,7 @@ completed: 2026-04-06
Each task was committed atomically: Each task was committed atomically:
1. **Task 1: Add fields state to DocumentPageClient and pass selectedFieldHint to PreparePanel** - `eec0bd9` (feat) 1. **Task 1: Add fields state to DocumentPageClient and pass selectedFieldHint to PreparePanel** - `eec0bd9` (feat)
2. **Task 2: Human E2E verification of full template-to-document flow** - Human approved all 12 steps (checkpoint)
## Files Created/Modified ## Files Created/Modified
- `teressa-copeland-homes/src/app/portal/(protected)/documents/[docId]/_components/DocumentPageClient.tsx` - Added fields state, useEffect to fetch fields, selectedFieldHint derivation, prop pass - `teressa-copeland-homes/src/app/portal/(protected)/documents/[docId]/_components/DocumentPageClient.tsx` - Added fields state, useEffect to fetch fields, selectedFieldHint derivation, prop pass
@@ -86,10 +87,29 @@ None.
## User Setup Required ## User Setup Required
None - no external service configuration required. None - no external service configuration required.
## Human Verification Results
Task 2 checkpoint approved. All 12 verification steps passed:
1. /portal/templates list page shows saved templates with form name, field count, and updated date (TMPL-16)
2. "Templates" appears in the portal top nav (TMPL-15)
3. Client profile "Add Document" modal opens
4. Modal shows two tabs: "Forms Library" and "My Templates" (TMPL-10)
5. My Templates tab shows saved templates with name, form name, and field count
6. Selecting a template auto-fills the document name with the template name
7. "Add Document" creates the document and returns to client page
8. Newly created document shows fields pre-loaded at correct positions (TMPL-11)
9. Clicking a text field with a hint shows "Template Hint" chip in PreparePanel Quick Fill (TMPL-13)
10. Clicking the hint chip fills the field with the hint text
11. Forms Library tab in a new modal still works as before (D-04)
12. Editing the template does NOT change the already-created document's fields (TMPL-14 — snapshot independence)
Requirements satisfied: TMPL-10, TMPL-11, TMPL-12, TMPL-13, TMPL-14, TMPL-15, TMPL-16 — all 7 confirmed
## Next Phase Readiness ## Next Phase Readiness
- Task 1 complete and committed - Phase 20 complete — v1.3 (Document Templates) milestone fully shipped
- Task 2 (checkpoint:human-verify) awaits human verification of full template-to-document flow - All 7 TMPL requirements (TMPL-10 through TMPL-16) verified by human
- After human approval, Phase 20 (and v1.3) will be complete - v1.3 roadmap objective achieved: agent can create reusable field layouts, apply them to new client documents, and get text hint quick-fill suggestions
--- ---
*Phase: 20-apply-template-and-portal-nav* *Phase: 20-apply-template-and-portal-nav*