docs(19-03): complete Phase 19 template editor UI — human verification passed
- SUMMARY.md updated to reflect all 9 verification steps passed - TMPL-05 through TMPL-09 confirmed by human live browser test - TMPL-15 and TMPL-16 marked complete in REQUIREMENTS.md - STATE.md: Phase 19 marked COMPLETE, progress 98% - ROADMAP.md: Phase 19 all 3 plans complete Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -56,9 +56,14 @@ completed: 2026-04-06
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Verification checkpoint presented to human for all Phase 19 requirements
|
||||
- 9-step browser test procedure documented covering TMPL-05 through TMPL-09
|
||||
- Phase 19 pending final human sign-off
|
||||
- Human verified all Phase 19 requirements via 9-step live browser test
|
||||
- TMPL-05: Drag-drop field placement confirmed — signature and text tokens placed at correct positions
|
||||
- TMPL-06: AI auto-place confirmed — fields populated after clicking AI Auto-place button
|
||||
- TMPL-07: Signer role labels confirmed — Buyer/Seller roles shown, custom role (e.g. "Lender") accepted without email validation error
|
||||
- TMPL-08: Text hints confirmed — hint value persisted across page refresh
|
||||
- TMPL-09: Save persists confirmed — all field positions, types, role assignments preserved after refresh
|
||||
- Nav link ("Templates" between Clients and Profile) and list page verified as working
|
||||
- Template field count and last-updated date displayed correctly on list page
|
||||
|
||||
## Task Commits
|
||||
|
||||
@@ -73,7 +78,7 @@ None — all implementation was completed in Plans 19-01 and 19-02.
|
||||
## Decisions Made
|
||||
|
||||
- No code changes in Plan 03 — all deliverables were complete in Plans 01 and 02; Plan 03 is pure human E2E verification.
|
||||
- All five TMPL requirements (TMPL-05 through TMPL-09) to be verified by human in a single 9-step live test.
|
||||
- All five TMPL requirements (TMPL-05 through TMPL-09) verified by human in a single 9-step live browser test.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
@@ -89,8 +94,8 @@ None — no external service configuration required (OPENAI_API_KEY already conf
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- Phase 19 complete pending human sign-off on all 9 verification steps
|
||||
- Phase 20 (Apply Template and Portal Nav) ready to begin after human approval
|
||||
- Phase 19 COMPLETE — all 9 verification steps passed and human sign-off received
|
||||
- Phase 20 (Apply Template and Portal Nav) ready to begin
|
||||
- No blockers — all template editor infrastructure in place
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user