docs(05-04): complete pdf-fill-and-field-mapping plan 04 checkpoint
- Created 05-04-SUMMARY.md documenting Phase 5 human verification checkpoint - Updated STATE.md: checkpoint:human-verify reached, awaiting sign-off on 10-step browser verification - All Phase 5 implementation (DOC-04, DOC-05, DOC-06) complete in plans 05-01 through 05-03 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
100
.planning/phases/05-pdf-fill-and-field-mapping/05-04-SUMMARY.md
Normal file
100
.planning/phases/05-pdf-fill-and-field-mapping/05-04-SUMMARY.md
Normal file
@@ -0,0 +1,100 @@
|
||||
---
|
||||
phase: 05-pdf-fill-and-field-mapping
|
||||
plan: "04"
|
||||
subsystem: ui
|
||||
tags: [human-verify, checkpoint, pdf, signature-fields, document-preparation]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 05-02-pdf-fill-and-field-mapping
|
||||
provides: Drag-and-drop FieldPlacer component on PDF pages with DB persistence
|
||||
- phase: 05-03-pdf-fill-and-field-mapping
|
||||
provides: TextFillForm and PreparePanel components wired to /api/documents/[id]/prepare
|
||||
- phase: 05-01-pdf-fill-and-field-mapping
|
||||
provides: POST /api/documents/[id]/prepare endpoint that writes prepared PDF and transitions status to Sent
|
||||
provides:
|
||||
- Human sign-off on Phase 5 end-to-end workflow (DOC-04, DOC-05, DOC-06)
|
||||
affects:
|
||||
- 06-signing-flow
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Human verification checkpoint: 10-step manual browser walkthrough covering all three requirements"
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "Phase 5 human verification: tester must confirm drag-and-drop placement, text fill form, client assignment, Prepare and Send, status transitions, and prepared PDF file creation on disk"
|
||||
|
||||
patterns-established: []
|
||||
|
||||
requirements-completed: [DOC-04, DOC-05, DOC-06]
|
||||
|
||||
# Metrics
|
||||
duration: 0min
|
||||
completed: "2026-03-20"
|
||||
---
|
||||
|
||||
# Phase 5 Plan 04: Human Verification Checkpoint Summary
|
||||
|
||||
**Phase 5 PDF fill and field mapping end-to-end browser verification — awaiting human tester sign-off on all 10 steps covering DOC-04, DOC-05, and DOC-06**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** 0 min (checkpoint plan — no auto tasks)
|
||||
- **Started:** 2026-03-20T06:08:20Z
|
||||
- **Completed:** Pending human verification
|
||||
- **Tasks:** 0 auto / 1 checkpoint
|
||||
- **Files modified:** 0
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Checkpoint reached after all Phase 5 implementation plans (05-01 through 05-03) completed
|
||||
- All three requirements (DOC-04, DOC-05, DOC-06) implemented in prior plans — awaiting human confirmation
|
||||
- Verification script prepared: 10-step browser walkthrough with expected outcomes for each step
|
||||
|
||||
## Task Commits
|
||||
|
||||
No auto tasks in this plan — this is a pure human-verification checkpoint.
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
None — this plan contains only a human-verification checkpoint task.
|
||||
|
||||
## Decisions Made
|
||||
|
||||
None - this plan is a blocking checkpoint requiring human verification before Phase 6 begins.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written. No auto tasks were present.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None — awaiting human verification.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None — application should already be running from prior development. If not:
|
||||
```bash
|
||||
cd teressa-copeland-homes && npm run dev
|
||||
```
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- **Blocked on:** Human tester completing all 10 verification steps and providing sign-off ("approved" signal)
|
||||
- Phase 6 (Signing Flow) can begin after this checkpoint passes
|
||||
- Key Phase 6 blocker: DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before signing links reach real clients
|
||||
|
||||
---
|
||||
*Phase: 05-pdf-fill-and-field-mapping*
|
||||
*Completed: 2026-03-20 (pending human sign-off)*
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- No auto tasks to verify — checkpoint plan only
|
||||
- SUMMARY.md created at expected path
|
||||
Reference in New Issue
Block a user