docs(05-04): complete pdf-fill-and-field-mapping plan 04 checkpoint

- Created 05-04-SUMMARY.md documenting Phase 5 human verification checkpoint
- Updated STATE.md: checkpoint:human-verify reached, awaiting sign-off on 10-step browser verification
- All Phase 5 implementation (DOC-04, DOC-05, DOC-06) complete in plans 05-01 through 05-03

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
Chandler Copeland
2026-03-20 00:09:26 -06:00
parent 3ad0382b96
commit 5bd77c1368
2 changed files with 106 additions and 6 deletions

View File

@@ -3,7 +3,7 @@ gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: unknown
last_updated: "2026-03-20T06:08:00Z"
last_updated: "2026-03-20T06:08:20Z"
progress:
total_phases: 5
completed_phases: 4
@@ -22,10 +22,10 @@ See: .planning/PROJECT.md (updated 2026-03-19)
## Current Position
Phase: 5 of 7 (PDF Fill and Field Mapping) — COMPLETE
Plan: 05-03 complete (3 of 3 plans in phase complete)
Status: Plan 05-03 complete — TextFillForm (key-value AcroForm field builder), PreparePanel (client selector + form + Prepare and Send button), document detail page extended with 2/3 + 1/3 grid layout
Last activity: 2026-03-20 — Plan 05-03 complete: TextFillForm.tsx and PreparePanel.tsx created, page.tsx extended with clients fetch and PreparePanel
Phase: 5 of 7 (PDF Fill and Field Mapping) — AWAITING HUMAN VERIFICATION
Plan: 05-04 (4 of 4 plans) — checkpoint:human-verify reached
Status: Plan 05-04 checkpoint reached — awaiting human tester to complete 10-step browser verification of DOC-04 (signature field placement), DOC-05 (text fill form), DOC-06 (Prepare and Send → status Sent + prepared PDF on disk)
Last activity: 2026-03-20 — Plan 05-04 checkpoint reached: all Phase 5 implementation complete, human sign-off required before Phase 6
Progress: [██████████] 100%
@@ -131,5 +131,5 @@ None yet.
## Session Continuity
Last session: 2026-03-20
Stopped at: Completed 05-03-PLAN.md — TextFillForm and PreparePanel components, extended document detail page with 2/3 + 1/3 split grid
Stopped at: 05-04-PLAN.md — checkpoint:human-verify reached; all Phase 5 implementation complete; awaiting human tester sign-off on 10-step browser verification
Resume file: None

View File

@@ -0,0 +1,100 @@
---
phase: 05-pdf-fill-and-field-mapping
plan: "04"
subsystem: ui
tags: [human-verify, checkpoint, pdf, signature-fields, document-preparation]
# Dependency graph
requires:
- phase: 05-02-pdf-fill-and-field-mapping
provides: Drag-and-drop FieldPlacer component on PDF pages with DB persistence
- phase: 05-03-pdf-fill-and-field-mapping
provides: TextFillForm and PreparePanel components wired to /api/documents/[id]/prepare
- phase: 05-01-pdf-fill-and-field-mapping
provides: POST /api/documents/[id]/prepare endpoint that writes prepared PDF and transitions status to Sent
provides:
- Human sign-off on Phase 5 end-to-end workflow (DOC-04, DOC-05, DOC-06)
affects:
- 06-signing-flow
# Tech tracking
tech-stack:
added: []
patterns:
- "Human verification checkpoint: 10-step manual browser walkthrough covering all three requirements"
key-files:
created: []
modified: []
key-decisions:
- "Phase 5 human verification: tester must confirm drag-and-drop placement, text fill form, client assignment, Prepare and Send, status transitions, and prepared PDF file creation on disk"
patterns-established: []
requirements-completed: [DOC-04, DOC-05, DOC-06]
# Metrics
duration: 0min
completed: "2026-03-20"
---
# Phase 5 Plan 04: Human Verification Checkpoint Summary
**Phase 5 PDF fill and field mapping end-to-end browser verification — awaiting human tester sign-off on all 10 steps covering DOC-04, DOC-05, and DOC-06**
## Performance
- **Duration:** 0 min (checkpoint plan — no auto tasks)
- **Started:** 2026-03-20T06:08:20Z
- **Completed:** Pending human verification
- **Tasks:** 0 auto / 1 checkpoint
- **Files modified:** 0
## Accomplishments
- Checkpoint reached after all Phase 5 implementation plans (05-01 through 05-03) completed
- All three requirements (DOC-04, DOC-05, DOC-06) implemented in prior plans — awaiting human confirmation
- Verification script prepared: 10-step browser walkthrough with expected outcomes for each step
## Task Commits
No auto tasks in this plan — this is a pure human-verification checkpoint.
## Files Created/Modified
None — this plan contains only a human-verification checkpoint task.
## Decisions Made
None - this plan is a blocking checkpoint requiring human verification before Phase 6 begins.
## Deviations from Plan
None - plan executed exactly as written. No auto tasks were present.
## Issues Encountered
None — awaiting human verification.
## User Setup Required
None — application should already be running from prior development. If not:
```bash
cd teressa-copeland-homes && npm run dev
```
## Next Phase Readiness
- **Blocked on:** Human tester completing all 10 verification steps and providing sign-off ("approved" signal)
- Phase 6 (Signing Flow) can begin after this checkpoint passes
- Key Phase 6 blocker: DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before signing links reach real clients
---
*Phase: 05-pdf-fill-and-field-mapping*
*Completed: 2026-03-20 (pending human sign-off)*
## Self-Check: PASSED
- No auto tasks to verify — checkpoint plan only
- SUMMARY.md created at expected path