diff --git a/.planning/phases/10-expanded-field-types-end-to-end/.continue-here.md b/.planning/phases/10-expanded-field-types-end-to-end/.continue-here.md new file mode 100644 index 0000000..7476b78 --- /dev/null +++ b/.planning/phases/10-expanded-field-types-end-to-end/.continue-here.md @@ -0,0 +1,65 @@ +--- +phase: 10-expanded-field-types-end-to-end +plan: 03 +task: 2 +total_tasks: 2 +status: in_progress +last_updated: 2026-03-21T19:30:04.017Z +--- + + +Phase 10 is paused at the human verification checkpoint (Plan 10-03, Task 2). +Plans 10-01 and 10-02 are complete and committed. Plan 10-03 Task 1 is committed (commit `50f082d`). +A bug was discovered and fixed (commit `a5173fe`) during verification — portal viewer now serves signed PDF. +Awaiting human to re-verify the full 4-step test and type "approved". + +The continuation agent ID for Plan 10-03 is: a84a384eb357cb642 + + + + +- Plan 10-01 (Wave 1): Typed FieldPlacer palette — 5 typed tokens with per-type colors, DragOverlay ghost, typed handleDragEnd, typed renderFields. Commits: 4140c22, 1e92ca3, 9f190b3. +- Plan 10-02 (Wave 1): Type-branched preparePdf() + POST handler fix — checkbox X mark, date amber placeholder, initials purple placeholder, text light gray; POST handler filters to signable fields only; date stamped at sign time. Commits: 7510c8e, d395d85, 9875c1a. +- Plan 10-03 Task 1: SignatureModal optional title prop + SigningPageClient overlay suppression (text/checkbox/date return null), initials modal support, purple pulse animation, updated progress/submit gate. Commit: 50f082d. +- Bug fix (discovered during verification): Portal viewer at /api/documents/[id]/file now serves signedFilePath when available so agent sees embedded signatures. Commit: a5173fe. + + + + +- Plan 10-03 Task 2: Human verification checkpoint — user needs to run the 4-step test (palette, prepare PDF, signing page, post-signing PDF) and type "approved" +- After "approved": Plan 10-03 SUMMARY.md must be created, STATE.md and ROADMAP.md updated +- Phase verification (gsd-verifier runs against FIELD-01, FIELD-02, FIELD-03, FIELD-04) +- Roadmap phase completion update + + + + +- Portal viewer serves signed PDF to agent (not original) — LEGAL-03 was interpreted as client-facing only; agent should see what was signed. File: src/app/api/documents/[id]/file/route.ts. +- Client signing page suppresses overlays for text/checkbox/date fields — these are baked into the prepared PDF at prepare time; no client interaction needed. +- Checkbox draws X mark at prepare time (not interactive on signing page). +- Date fields stamped with actual signing date server-side at POST time (not prepare time). +- signableFields filter: only client-signature + initials go through embedSignatureInPdf. + + + + +- None blocking — user reported "lost signatures/date/checkbox" which was the portal viewer serving original PDF instead of signed PDF. Fixed in commit a5173fe. +- User also reported "client sees all field boxes" — this is the prepared PDF placeholder rectangles (correct behavior), not the overlay divs. Plan 10-03 overlay suppression IS in the code at line 303. + + + +Phase 10 execution is 95% done. All code is working correctly — verified by direct PDF inspection showing signatures, date stamp (03/21/2026), and checkbox X mark all embedded correctly in the signed PDF. The only remaining step is human sign-off on the 4-step test. The executor subagent for Plan 10-03 is paused at the checkpoint and needs to be resumed (fresh spawn, not resume) with user_response="approved" once testing passes. + +Key insight: the portal viewer was loading doc.filePath (original) instead of doc.signedFilePath. Fixed. The "all field boxes" complaint was the prepared PDF placeholders being visible to the client on the signing page — this is expected and correct (they show what was placed before the client signed). + + + +Resume with: /gsd:resume-work + +Then: Run `npm run dev` in teressa-copeland-homes, execute the 4-step verification from Plan 10-03 (palette → prepare PDF → signing page → post-signing PDF), then type "approved" to close the checkpoint and finish phase execution (SUMMARY.md, verifier, roadmap update). + +To continue the checkpoint, spawn a fresh gsd-executor with: +- Plan: .planning/phases/10-expanded-field-types-end-to-end/10-03-PLAN.md +- Prior summaries: 10-01-SUMMARY.md, 10-02-SUMMARY.md +- user_response: "approved" (after human verifies) +