docs(01-02): complete login pages and auth UI plan
- 01-02-SUMMARY.md: branded login page, password toggle, dashboard stub, logout - STATE.md: advanced to plan 2/3, added three new auth UI decisions - ROADMAP.md: updated phase 01 progress to 2/3 plans complete - REQUIREMENTS.md: AUTH-04 marked complete (logout with signed-out confirmation)
This commit is contained in:
@@ -2,13 +2,13 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.0
|
||||
milestone_name: milestone
|
||||
status: unknown
|
||||
last_updated: "2026-03-19T19:35:42.689Z"
|
||||
status: in_progress
|
||||
last_updated: "2026-03-19T19:39:35Z"
|
||||
progress:
|
||||
total_phases: 1
|
||||
completed_phases: 0
|
||||
total_plans: 3
|
||||
completed_plans: 1
|
||||
completed_plans: 2
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -23,28 +23,28 @@ See: .planning/PROJECT.md (updated 2026-03-19)
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 7 (Foundation)
|
||||
Plan: 1 of 4 in current phase
|
||||
Plan: 2 of 3 in current phase
|
||||
Status: In progress
|
||||
Last activity: 2026-03-19 — Plan 01-01 complete: Next.js scaffold, Drizzle schema, Auth.js v5
|
||||
Last activity: 2026-03-19 — Plan 01-02 complete: Branded login page, agent dashboard stub, logout mechanism
|
||||
|
||||
Progress: [█░░░░░░░░░] 4%
|
||||
Progress: [██░░░░░░░░] 8%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 1
|
||||
- Average duration: 6 min
|
||||
- Total plans completed: 2
|
||||
- Average duration: 4 min
|
||||
- Total execution time: 0.1 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 01-foundation | 1/4 | 6 min | 6 min |
|
||||
| 01-foundation | 2/3 | 8 min | 4 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 01-01 (6 min)
|
||||
- Trend: baseline
|
||||
- Last 5 plans: 01-01 (6 min), 01-02 (2 min)
|
||||
- Trend: faster
|
||||
|
||||
*Updated after each plan completion*
|
||||
|
||||
@@ -61,6 +61,9 @@ Recent decisions affecting current work:
|
||||
- utahrealestate.com forms scraping: AVOID — violates ToS; use manual PDF upload instead
|
||||
- [Phase 01-foundation]: Lazy Proxy singleton for db/index.ts prevents neon() crash during Next.js build when DATABASE_URL absent
|
||||
- [Phase 01-foundation]: next-auth pinned to exact version 5.0.0-beta.30; middleware.ts at project root not src/; force-dynamic on auth route
|
||||
- [Phase 01-foundation 01-02]: PasswordField extracted as co-located client sub-component — keeps login page.tsx as pure server component
|
||||
- [Phase 01-foundation 01-02]: loginAction re-throws non-AuthError (NEXT_REDIRECT must bubble) — critical Auth.js v5 server action pattern
|
||||
- [Phase 01-foundation 01-02]: Brand colors applied via inline style props — Tailwind JIT may miss one-off hex values
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -72,9 +75,10 @@ None yet.
|
||||
- Phase 6 (Signing Flow) warrants a /gsd:research-phase before planning — JWT one-time enforcement + ESIGN/UETA audit + mobile touch has edge cases
|
||||
- DNS (SPF/DKIM/DMARC) for teressacopelandhomes.com must be configured before any signing link reaches a real client (Phase 6 acceptance criterion)
|
||||
- Exact WFRMLS required IDX disclaimer text must be obtained directly from WFRMLS before listings feature ships (Phase 2)
|
||||
- Neon + Vercel provisioning required before runtime auth flow can be tested end-to-end
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-19
|
||||
Stopped at: Completed 01-01-PLAN.md — Next.js scaffold, Drizzle schema, Auth.js v5, route protection
|
||||
Stopped at: Completed 01-02-PLAN.md — Branded login UI, agent portal layout, dashboard stub, logout mechanism
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue
Block a user