docs(06-06): complete DNS verification plan — LEGAL-04 satisfied, Phase 6 complete
- 06-06-SUMMARY.md: SPF/DKIM/DMARC verified green via Resend for tcopelandhomes.com - STATE.md: Plan 06 complete, completed_plans 24/24, Phase 6 fully complete - ROADMAP.md: Phase 6 marked complete (6/6 plans), completed 2026-03-21 - REQUIREMENTS.md: LEGAL-04 marked complete Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -3,12 +3,12 @@ gsd_state_version: 1.0
|
||||
milestone: v1.0
|
||||
milestone_name: milestone
|
||||
status: unknown
|
||||
last_updated: "2026-03-20T17:41:00Z"
|
||||
last_updated: "2026-03-21T15:43:33.117Z"
|
||||
progress:
|
||||
total_phases: 6
|
||||
completed_phases: 5
|
||||
completed_phases: 6
|
||||
total_plans: 24
|
||||
completed_plans: 23
|
||||
completed_plans: 24
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -22,12 +22,12 @@ See: .planning/PROJECT.md (updated 2026-03-19)
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 6 of 7 (Signing Flow) — Plan 5 complete (PHASE COMPLETE)
|
||||
Plan: 06-05 (5 of 5 plans) — Post-signing confirmation page + client PDF download with 15-min token
|
||||
Status: Confirmation page at /sign/[token]/confirmed shows success checkmark, document name, signed timestamp, and download button. GET /api/sign/[token]/download streams signedFilePath PDF authorized by short-lived download JWT (dt param). createDownloadToken/verifyDownloadToken added to token.ts. SigningPageClient uses router.push. npm run build passes cleanly.
|
||||
Last activity: 2026-03-20 — Phase 6 Plan 05: confirmation page + download route
|
||||
Phase: 6 of 7 (Signing Flow) — Plan 6 complete (PHASE COMPLETE)
|
||||
Plan: 06-06 (6 of 6 plans) — DNS email authentication (SPF/DKIM/DMARC) verified for tcopelandhomes.com via Resend — LEGAL-04 satisfied
|
||||
Status: All three MXToolbox checks (SPF, DKIM, DMARC) verified green/pass for tcopelandhomes.com. Resend configured as SMTP provider with DKIM at resend._domainkey.tcopelandhomes.com. Signing emails may now be sent to real clients.
|
||||
Last activity: 2026-03-21 — Phase 6 Plan 06: DNS verification checkpoint — LEGAL-04 compliance gate satisfied
|
||||
|
||||
Progress: [█████████░] 95%
|
||||
Progress: [██████████] 100% (Phase 6 complete)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
@@ -63,6 +63,7 @@ Progress: [█████████░] 95%
|
||||
| Phase 06-signing-flow P03 | 3 | 2 tasks | 6 files |
|
||||
| Phase 06-signing-flow P04 | 7 | 2 tasks | 4 files |
|
||||
| Phase 06-signing-flow P05 | 3 | 2 tasks | 4 files |
|
||||
| Phase 06-signing-flow P06 | 2 | 2 tasks | 2 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -152,6 +153,6 @@ None yet.
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-20
|
||||
Stopped at: Completed 06-05-PLAN.md — confirmation page, client PDF download route, Phase 6 complete
|
||||
Last session: 2026-03-21
|
||||
Stopped at: Completed 06-06-PLAN.md — DNS verification checkpoint, LEGAL-04 satisfied, Phase 6 fully complete
|
||||
Resume file: None
|
||||
|
||||